Increased Copper inventory in mainstream areas this week.

Published: Feb 1, 2024 15:10
Source: SMM
As of Thursday, February 1, SMM national mainstream areas of copper stocks increased by 10,300 tons to 102,300 tons compared with Monday, an increase of 17,100 tons compared with last Friday, the third consecutive weekly accumulation of inventory and there are signs of acceleration. Compared with Monday's inventory change, the inventory in all regions of the country are increasing; the total inventory is 161,600 tons lower than the 263,900 tons of the same period last year

As of Thursday, February 1, the national mainstream areas of copper stocks increased by 10,300 tons to 102,300 tons compared with Monday. This marks an increase of 17,100 tons compared with last Friday, continuing the trend of weekly accumulation and showing signs of acceleration. Overall, compared with Monday's inventory changes, the inventory of all regions of the country has increased. However, the total inventory is 161,600 tons lower than the same period last year of 263,900 tons. Specifically, the Shanghai region is lower than the same period last year by 84,800 tons, the Guangdong region is lower by 30,800 tons, and the Jiangsu region is lower by 40,500 tons.

In detail, the Shanghai region's inventory increased by 0.66 million tons to 69,800 tons compared with Monday, and the Jiangsu region's inventory increased by 0.05 million tons to 0.81 million tons compared with Monday. The increase in stocks in East China is primarily due to downstream enterprises gradually entering the holiday state, leading to an increase in shipments to the warehouse by smelters. Similarly, stocks in Guangdong increased by 0.23 million tons to 17.1 million tons. The increase in arrivals in Guangdong has been accompanied by a decrease in outgoing stocks, reflected in the continuous decline in the average daily outgoing stocks in Guangdong, indicating an overall situation of oversupply.

Looking ahead to next week, which will be the last week before the holiday, most of the downstream enterprises are expected to enter the vacation state with little demand. As a result, smelters are anticipated to increase the amount of shipments to the warehouse. Therefore, it is expected that the weekly inventory will increase significantly next week.

For more information, please contact raezhang@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
8 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
8 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
8 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
Read More
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
8 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
10 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Read More
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Epiroc has secured an approximately SEK610 million (US$64 million) order from MMG Limited and its mining contractors, China Huaye and 23MCC, for underground mining equipment to support the expansion of the Khoemacau Copper Mine in Botswana. The order includes face drilling rigs, production drilling rigs, cable-bolting rigs, loaders and underground mine trucks, together with remote-control systems, spare parts, training and on-site technical support. The equipment will support MMG’s ongoing Khoemacau expansion, which is designed to increase annual production capacity from approximately 60,000 tonnes to 130,000 tonnes of copper metal in concentrate. The project includes construction of a new 4.5 Mt/y processing plant, which will lift total milling capacity to more than 8 Mt/y, alongside development of Zone 5 North, Mango and Zeta North-East. First copper concentrate from the expansion is expected in H1 2028. Epiroc said delivery of the new underground fleet will begin in Q4 2026 and is expected to be completed by Q2 2028, broadly aligning with the expansion schedule. The ordered fleet includes Boomer face drilling rigs, Simba production drilling rigs, Cabletec cable-bolting rigs, Scooptram loaders and Minetruck underground trucks, with several units equipped for automation and remote-control operation. The equipment order represents another execution milestone for the already-approved Khoemacau expansion, rather than a new production target. With procurement progressing and equipment deliveries scheduled through Q2 2028, the project continues to advance toward MMG’s planned increase in copper-in-concentrate capacity to 130,000 tonnes per year. The expansion represents a significant planned increase in Khoemacau’s copper production capacity in Botswana’s Kalahari Copper Belt.
10 hours ago