China Energy Engineering Corporation Signs Contract for Solar Project in the Philippines
China Energy Engineering Corporation has officially signed an EPC (Engineering, Procurement, and Construction) contract for the San Marcelino Phase III photovoltaic power station project in the Philippines with AC Energy, a subsidiary of the Ayala Group, in Manila.
The San Marcelino Phase III photovoltaic power station is located in the province of San Marcelino in the Philippines and is an expansion project of the San Marcelino Phase I and Phase II projects constructed by China Energy Engineering Corporation, with a total installed capacity of 200 megawatts.
The San Marcelino photovoltaic power station is the largest solar project in the Philippines, with a total installed capacity of 384 megawatts for Phase I and Phase II, and it will reach 584 megawatts after the completion of Phase III.
![[Новости SMM PV] На высоте 4700 метров! Крупнейший фотоэлектрический проект в среднем и нижнем течении реки Ярлунг-Цангпо в Тибете завершён.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Новости солнечной энергетики] Министерство энергетики США (DOE) инвестирует 12 миллионов долларов в разработку космических фотоэлектрических технологий](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[Новости SMM PV] Создание европейского эталона | Проект трекерной системы Chiko Solar Energy мощностью 221 МВт в Италии официально запущен](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
