SMM Copper Morning Comment

Published: Dec 8, 2023 09:58
LME copper prices opened at $8308.5/mt and closed at $8370/mt in overnight trading, a gain of 1.49%, with the low-end of $8291/mt and the high-end of $8371.5/mt. Trading volume was 20,000 lots, and open interest stood at 285,000 lots. The most active SHFE 2401 copper contract prices opened at 67530 yuan/mt and finished at 67670 yuan/mt overnight, up 0.13%, with the low-end of 67490 yuan/mt and the high-end of 67770 yuan/mt. Trading volume was 19,000 lots and open interest stood at 148,000 lots.

LME copper prices opened at $8308.5/mt and closed at $8370/mt in overnight trading, a gain of 1.49%, with the low-end of $8291/mt and the high-end of $8371.5/mt. Trading volume was 20,000 lots, and open interest stood at 285,000 lots. The most active SHFE 2401 copper contract prices opened at 67530 yuan/mt and finished at 67670 yuan/mt overnight, up 0.13%, with the low-end of 67490 yuan/mt and the high-end of 67770 yuan/mt. Trading volume was 19,000 lots and open interest stood at 148,000 lots. On the macro front, as of December 2, the number of initial jobless claims in the United States rose to 220,000, slightly lower than the expected 222,000. In addition, data released on Thursday showed that China's exports increased for the first time in six months in November, which stimulated market sentiment to a certain extent. The market is awaiting the upcoming non-farm payrolls report to further confirm the Fed's subsequent moves. In terms of fundamentals, as the price spread between front-month and next-month contracts continued to expand in East China yesterday, premiums and discounts fell. Downstream purchasing enthusiasm picked up. It is expected that the spot prices will unlikely continue to decline; South China was also affected by the high price spread between front-month and next-month contracts. Due to the decline in local inventory, cargo holders wanted to raise prices, but downstream acceptance was not high. In terms of consumption, both the SHFE copper price and premiums and discounts declined, which has stimulated spot demand to a certain extent. It is expected that demand will be stronger in the near future. The fundamentals will support copper prices.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
8 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
8 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
8 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
Read More
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
8 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
10 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Read More
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Epiroc has secured an approximately SEK610 million (US$64 million) order from MMG Limited and its mining contractors, China Huaye and 23MCC, for underground mining equipment to support the expansion of the Khoemacau Copper Mine in Botswana. The order includes face drilling rigs, production drilling rigs, cable-bolting rigs, loaders and underground mine trucks, together with remote-control systems, spare parts, training and on-site technical support. The equipment will support MMG’s ongoing Khoemacau expansion, which is designed to increase annual production capacity from approximately 60,000 tonnes to 130,000 tonnes of copper metal in concentrate. The project includes construction of a new 4.5 Mt/y processing plant, which will lift total milling capacity to more than 8 Mt/y, alongside development of Zone 5 North, Mango and Zeta North-East. First copper concentrate from the expansion is expected in H1 2028. Epiroc said delivery of the new underground fleet will begin in Q4 2026 and is expected to be completed by Q2 2028, broadly aligning with the expansion schedule. The ordered fleet includes Boomer face drilling rigs, Simba production drilling rigs, Cabletec cable-bolting rigs, Scooptram loaders and Minetruck underground trucks, with several units equipped for automation and remote-control operation. The equipment order represents another execution milestone for the already-approved Khoemacau expansion, rather than a new production target. With procurement progressing and equipment deliveries scheduled through Q2 2028, the project continues to advance toward MMG’s planned increase in copper-in-concentrate capacity to 130,000 tonnes per year. The expansion represents a significant planned increase in Khoemacau’s copper production capacity in Botswana’s Kalahari Copper Belt.
10 hours ago