Telah Terbit: Nov 30, 2023 17:53

On November 28, Nenghui Technology issued an announcement stating that on October 12, the company disclosed the "Announcement of Receiving the Bid-Winning Notice," and the company was confirmed as the winning bidder for the "The 28th batch of rooftop distributed photovoltaic project equipment and operation and maintenance framework agreement bidding (Section 1)" and "The 28th batch of rooftop distributed photovoltaic project equipment and operation and maintenance framework agreement bidding (Section 2)" for Yuexiu New Energy in 2023, with winning bid prices of 3.68 yuan/Wp (including tax) and 0.045 yuan/Wp (including tax) respectively for the unit installation capacity.

Recently, Nenghui Technology has signed contracts with Yuexiu New Energy and its subsidiaries for the aforementioned winning bid projects, including the "Operation and Maintenance Service Agreement." The company will provide distributed photovoltaic project equipment and operation and maintenance services to them, and Guangzhou Yuexiu New Energy Investment Co., Ltd. or its subsidiary project company plans to purchase photovoltaic power stations from the company for no more than 100 million yuan.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
5 jam yang lalu
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
Baca Selengkapnya
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
Baru-baru ini, PLTS Luobusha Fase I berkapasitas 850 MW di Kabupaten Qusum, Tibet, yang dibangun oleh PowerChina, berhasil lolos uji terima penyelesaian, memberikan dukungan penting untuk meredakan ketegangan pasokan-permintaan listrik regional dan memperkuat benteng pasokan energi dataran tinggi. PLTS Luobusha di Kabupaten Qusum, Tibet, mencakup area sekitar 4.289,59 mu, dengan total kapasitas terpasang 850 MW. Ini merupakan gelombang pertama proyek PLTS komersial utama di Basis Energi Bersih Yazhong di Tibet dan proyek pembangkit listrik bersih PLTS terbesar di bagian tengah dan hilir Sungai Yajiang. Proyek ini dikembangkan dalam empat fase, dengan Fase I berkapasitas 200 MW dan elevasi rata-rata 4.700 meter. Chengdu Engineering Corporation di bawah PowerChina melaksanakan pembangunan stasiun penguat 220 kV, area PLTS 50 MW, jalur transmisi 20,74 km, dan perluasan gardu induk di sisi berlawanan; Sinohydro Bureau 9 melaksanakan pembangunan area ladang PLTS 150 MW, memasang total 348.000 modul PLTS, beserta 64 transformator tipe kotak dan 704 inverter.
5 jam yang lalu
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
5 jam yang lalu
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
Baca Selengkapnya
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
Pada 31 Agustus, Departemen Energi AS (DOE) mengumumkan peluang pendanaan riset dan pengembangan PV luar angkasa baru dengan total hingga $12 juta. Pengumuman tersebut menyatakan tujuannya secara jelas: menurunkan biaya sel surya dan modul untuk aplikasi luar angkasa, memperluas kapasitas manufaktur domestik di AS, dan memajukan prototipe menuju validasi pihak ketiga di lingkungan luar angkasa atau dekat luar angkasa.
5 jam yang lalu
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
5 jam yang lalu
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
Baca Selengkapnya
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
Baru-baru ini, Xin Hengyuan Energy resmi meluncurkan proyek benchmark dukungan pelacakan 221 MW. Proyek ini merupakan proyek tunggal utama yang dikerjakan oleh perusahaan di kawasan Eropa, menandai terobosan penting dalam ekspansi strategis perusahaan ke pasar di luar Tiongkok. Hal ini secara signifikan memajukan pengembangan energi rendah karbon setempat dan memberikan dorongan kuat bagi transisi energi hijau di kawasan tersebut.
5 jam yang lalu
On November 28, Nenghui Technology issued an announcement stating that - Shanghai Metals Market (SMM)