Don't miss out on SMM upcoming FREE webinar on [Battery Materials Market Dynamics And Price Forecast In China]

Published: Nov 21, 2023 14:03
Don't miss out on SMM upcoming FREE webinar on [Battery Materials Market Dynamics And Price Forecast In China], co-organized by Battery Associates and featuring contributors from Great Power, Huayou Holding (investment enterprise of Zhejiang Huayou Cobalt Co.,Ltd), and BTR New Material Group Co., Ltd.

Don't miss out on SMM upcoming FREE webinar on [Battery Materials Market Dynamics And Price Forecast In China], co-organized by Battery Associates and featuring contributors from Great Power, Huayou Holding (investment enterprise of Zhejiang Huayou Cobalt Co.,Ltd), and BTR New Material Group Co., Ltd.

⏰ Join us on November 30, 2023, from 4:00-5:45 PM Beijing Time for an insightful discussion on the future of global LFP and NCM battery demand, innovation in battery materials production, and sustainable alternatives for the industry.

The Full Agenda:
- Keynote Speech 1
Topic: Outlook For Future Global LFP And NCM Battery And Key Materials Demand-Supply Structure
Speaker: Thomas Feng, Battery Material Analyst, SMM

- Keynote Speech 2
Topic: Battery Associates' Role in the Battery Industry Ecosystem
Speaker: Dr. Simon Engelke, Founder & Chair, Battery Associate

- Panel Discussion
Topic: Innovation and Technological Advancements in Battery Materials Production, Challenges and Opportunities for Battery Materials Manufacturers, Future of Battery Materials: Sustainable Alternatives.
Moderator: Dr. Simon Engelke, Founder & Chair, Battery Associate
Speaker 1: Dr. Huabo Liu, Product Director, Great Power
Speaker 2: Li Guo, Deputy Minister of Sales Department, Huayou Holding
Speaker 3: Eric Wang, Director of European Project Department, BTR

Save your spot now and gain invaluable insights into this industry!

Register now: https://www.metal.com/events/live/battery-materials-market-dynamics-and-price-forecast-in-china/186

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
17 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
17 hours ago