China's Refined Zinc Output In October

Published: Nov 9, 2023 16:36
SMM statistics showed that China's refined zinc output was 604,600 mt in October, a growth of 60,600 mt or 11.14% month-on-month and up 17.6% year-on-year, exceeding expectations. The output totalled around 5.45 million mt from January to October, up 10.65% year-on-year. Domestic zinc alloy production in October was 98,180 mt, an increase of 9,900 mt from the previous month.

SMM statistics showed that China's refined zinc output was 604,600 mt in October, a growth of 60,600 mt or 11.14% month-on-month and up 17.6% year-on-year, exceeding expectations. The output totalled around 5.45 million mt from January to October, up 10.65% year-on-year. Domestic zinc alloy production in October was 98,180 mt, an increase of 9,900 mt from the previous month.

In October, the output of domestic smelters increased significantly to over 600,000 mt. Except for the maintenance of smelters in Hunan and Gansu, other companies basically resumed normal production. There were fewer market disturbance factors, and smelters were highly motivated to produce. Strong alloy sales also drove some output growth. In addition, thanks to zinc oxide ore from Huoshaoyun mine, raw material supply at some secondary zinc smelters in Sichuan increased, growing output. The disruption from peak-hour power consumption measures in Hunan was reduced, and the production of secondary zinc smelters recovered.

SMM predicts that domestic refined zinc production in November 2023 will decrease by 6,000 mt from the previous month to 598,600 mt, a year-on-year increase of 14.09%; the cumulative output from January to November will reach 6.051 million mt, a year-on-year increase of 10.98%; the production will drop slightly in November, mainly due to the half-month maintenance at some smelters in Yunnan and the power rationing of 10% in Yunnan issued at the beginning of the month. The overall output reduction is expected to be around 1,100 mt. Smelters in Gansu resumed from maintenance and increased output. Overall, the output reduction is not obvious yet and is basically in line with expectations.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
5 hours ago
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Read More
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Bunker Hill Mining announced on September 1 that its Bunker Hill lead-zinc mine in Idaho, USA, produced its first lead and zinc concentrates in late June 2026. The operation is currently ramping up, with ongoing optimisation of underground mining and processing operations. The processing plant has a design capacity of 1,800 tonnes per day, with planned combined annual output of approximately 85,000 tonnes of zinc concentrate and silver-bearing lead concentrate. The company plans to supplement working capital through standby financing and concentrate prepayment arrangements, targeting full commercial production by the end of 2026. SMM forecasts the mine’s 2026 output at approximately 25,000 tonnes of zinc in concentrate and 10,000–15,000 tonnes of lead in concentrate, both on a contained-metal basis. Meanwhile, recent underground drilling at the Cate-8 mineralised zone returned maximum sample grades of 41.1% lead and 7.41% zinc. The company is assessing the feasibility of incorporating the zone into its near-term mine plan. As production ramps up, the mine is expected to provide incremental lead and zinc supply to North America.
5 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
8 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
8 hours ago
Data: SHFE, DCE market movement (Sep 02)
11 hours ago
Data: SHFE, DCE market movement (Sep 02)
Read More
Data: SHFE, DCE market movement (Sep 02)
Data: SHFE, DCE market movement (Sep 02)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 02 Sep , 2026
11 hours ago