Inner Mongolia's richest man, Du Jiangtao, controlled Jun Zheng Group announced that it plans to invest 2.573 billion yuan to build a 450MW photovoltaic power generation project. The construction period of the project is two years, from June 2023 to June 2025, with a total land area of about 22950 mu. The photovoltaic components are proposed to adopt P-type PERC double-sided single-crystal silicon components or N-type double-sided single-crystal silicon components. The bracket adopts fixed or adjustable fixed or flat single-axis bracket, and the inverter adopts string or centralized inverter scheme. A new 220KV substation is built to send to the Narutu 220KV gathering station.
Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market exchanges, and relying on SMM's internal database model, for reference only and do not constitute decision-making recommendations.