From September 4th to September 10th of 2023, according to SMM statistics, there are 51 projects (including sections) of photovoltaic components won by many enterprises such as Longji, Jinko, Jinko, and Tianhe, among which 37 projects disclose the installed capacity. The winning price range is concentrated at 1.19-1.23 yuan/watt; the weighted average price of the week is 1.23 yuan/watt, which is 0.02 yuan/watt lower than last week; the total installed capacity of the winning bid is 11888.24MW, which is 600.25MW higher than last week, and the proportion of N-type components is 48%. Many collective tenders such as Three Gorges, Beijing Energy, and China Hua have been tendered.