Published: Sep 07, 2023 09:12 (GMT+8)

Recently, with the commissioning of Unit 4, the Henan Tianchi Pumped Storage Power Station, which was constructed by Water Resources Eleventh Bureau, has been put into commercial operation three months ahead of schedule, fully achieving the goal of all four units being put into operation this year.

Located in Mashiping Township, Nanyang City, Henan Province, Henan Tianchi Pumped Storage Power Station is a major energy infrastructure project in Henan Province. The project consists of an upper reservoir, a lower reservoir, a waterway system, an underground plant and a ground switch station, with a total installed capacity of 1.2 million kilowatts, and four single-unit pumps with a capacity of 300,000 kilowatts each. The designed annual power generation is 962 million kilowatt-hours. The Water Resources Eleventh Bureau undertook the construction of the upper and lower reservoirs, spillways, diversion tunnels, intake/outlet, and ground switch station of the Tianchi Pumped Storage Power Station. Among them, the upper reservoir dam is 118.4 meters high, and the lower reservoir dam is 100.6 meters high.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Smartphone Shipments Decline YoY in Q3, Huawei Only Major Brand to Post Double-Digit Growth
12 mins ago
China Smartphone Shipments Decline YoY in Q3, Huawei Only Major Brand to Post Double-Digit Growth
Read More
China Smartphone Shipments Decline YoY in Q3, Huawei Only Major Brand to Post Double-Digit Growth
China Smartphone Shipments Decline YoY in Q3, Huawei Only Major Brand to Post Double-Digit Growth
【China Smartphone Shipments Decline YoY in Q3, Huawei Only Top Vendor to Post Double-Digit Growth】China smartphone shipments in Q3 2026 totaled approximately 57.9 million units, down 15.4% year-on-year, compared to a decline of approximately 4% in H1. By vendor, Huawei held a 21.1% share, up 17.3% YoY, making it the only major vendor to achieve double-digit growth; Apple held 17.8%, down 4.3%; OPPO 15.5%, down 17.6%; vivo 15.3%, down 24.9%; Xiaomi 13.8%, down 20.4%; and Honor 13.0%, down 24.2%. The quarter was characterized by declining volumes and rising prices, as cost increases pushed up average selling prices.
12 mins ago
Guanghua Technology Reports Strong Revenue Growth for First Three Quarters
20 mins ago
Guanghua Technology Reports Strong Revenue Growth for First Three Quarters
Read More
Guanghua Technology Reports Strong Revenue Growth for First Three Quarters
Guanghua Technology Reports Strong Revenue Growth for First Three Quarters
【Guanghua Technology Reports Strong Revenue Growth for First Three Quarters of 2026】Guanghua Technology disclosed its Q3 2026 report, with revenue for the first three quarters reaching CNY 3.575 billion, up 74.89% year-on-year, net profit attributable to shareholders of CNY 129 million, up 42.29% year-on-year, and non-recurring net profit of CNY 124 million, up 40.44% year-on-year. For Q3 alone, revenue reached CNY 1.328 billion, up 74.15% year-on-year, with net profit attributable to shareholders of CNY 34.34 million, up 0.62% year-on-year.
20 mins ago
Malaysia Discloses Battery Waste Volume Data for First Time, Mandatory Recycling Regime Not Yet in Place
23 mins ago
Malaysia Discloses Battery Waste Volume Data for First Time, Mandatory Recycling Regime Not Yet in Place
Read More
Malaysia Discloses Battery Waste Volume Data for First Time, Mandatory Recycling Regime Not Yet in Place
Malaysia Discloses Battery Waste Volume Data for First Time, Mandatory Recycling Regime Not Yet in Place
【Malaysia Discloses Battery Waste Volume Data for First Time via Parliamentary Reply, Mandatory Recycling Regime Not Yet Established】Malaysia’s Ministry of Natural Resources and Environmental Sustainability disclosed for the first time in a written parliamentary reply that 13,743.15 tonnes of SW103-category battery waste were generated nationwide from 2021 to 2025, with only seven licensed off-site recycling facilities in operation as of March 2026, located across Kedah, Selangor, Johor, Perak, Negeri Sembilan, and Penang. The ministry also confirmed that a mandatory battery recycling (extended producer responsibility) regime for EV manufacturers has not yet been established, with legislation still under study regarding legal basis, funding mechanisms, and inter-ministerial coordination. The Department of Environment is drafting Phase 2 amendments to the Environmental Quality Act 1974, incorporating a blacklisting mechanism targeting repeat offenders.
23 mins ago