[SMM Copper Morning Comments] US Q2 GDP Exceeded Expectations and Overnight Copper Rose

Published: Jul 28, 2023 10:11
Source: SMM
LME copper prices closed at $8,551/mt last evening, down 0.62%. Trading volume was 16,000 lots and open interest stood at 275,000 lots. The most active SHFE 2309 copper contract finished at 68,900 yuan/mt overnight, down 0.39%. Trading volume was 35,000 lots, and open interest stood at 184,000 lots.

LME copper prices closed at $8,551/mt last evening, down 0.62%. Trading volume was 16,000 lots and open interest stood at 275,000 lots. The most active SHFE 2309 copper contract finished at 68,900 yuan/mt overnight, down 0.39%. Trading volume was 35,000 lots, and open interest stood at 184,000 lots.

On the macro front, the US GDP growth unexpectedly accelerated in the second quarter, and the growth rate of durable goods orders in June also far exceeded expectations, increasing the expectation of a "soft landing". Better-than-expected US economic data dampened investor expectations for a relatively dovish monetary policy by the Federal Reserve. In terms of fundamentals, copper prices soared yesterday, the enthusiasm for trading in the spot market declined, while some traders restocked on the dip.

Some downstream buyers in east China restocked for weekend production in advance. Sellers in south China sold goods at low prices, but the downstream purchasing enthusiasm was weak. End-user consumption was weak, and most of the trades were contributed by traders. On the macro front, the U.S. economy is still resilient. It is expected that copper prices will remain high in the near future.

 

More popular news:

Shenzhen Released 24 Measures To Support High-Quality Development Of Foreign Trade

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

SMM Daily Comments (Jul 3): SHFE Base Metals Rose across the Board with Tin Surging, Ferrous Metals Prices Closed Mixed

SMM Daily Comments (Jul 5): Base and Ferrous Metals Prices Mostly Fell, WTI Soared despite Lingering Concerns over Global Economic Downturn

SMM Daily Comments (Jul 6): SHFE, LME Base Metals Diverged with SHFE Nickel and Tin Skyrocketing, Ferrous Metals Rose across the Board

China Commodity Supply and Demand Boomed in June

China Vows To Increase Macro-Control Efforts, Expand Consumption And Stabilise Investment

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

Copper Inventories in China Bonded Zones Plunged This Week

SAIC: Car Sales in June Rose to Highest for The Year


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
13 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
13 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
14 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
Read More
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
14 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
15 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Read More
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Epiroc has secured an approximately SEK610 million (US$64 million) order from MMG Limited and its mining contractors, China Huaye and 23MCC, for underground mining equipment to support the expansion of the Khoemacau Copper Mine in Botswana. The order includes face drilling rigs, production drilling rigs, cable-bolting rigs, loaders and underground mine trucks, together with remote-control systems, spare parts, training and on-site technical support. The equipment will support MMG’s ongoing Khoemacau expansion, which is designed to increase annual production capacity from approximately 60,000 tonnes to 130,000 tonnes of copper metal in concentrate. The project includes construction of a new 4.5 Mt/y processing plant, which will lift total milling capacity to more than 8 Mt/y, alongside development of Zone 5 North, Mango and Zeta North-East. First copper concentrate from the expansion is expected in H1 2028. Epiroc said delivery of the new underground fleet will begin in Q4 2026 and is expected to be completed by Q2 2028, broadly aligning with the expansion schedule. The ordered fleet includes Boomer face drilling rigs, Simba production drilling rigs, Cabletec cable-bolting rigs, Scooptram loaders and Minetruck underground trucks, with several units equipped for automation and remote-control operation. The equipment order represents another execution milestone for the already-approved Khoemacau expansion, rather than a new production target. With procurement progressing and equipment deliveries scheduled through Q2 2028, the project continues to advance toward MMG’s planned increase in copper-in-concentrate capacity to 130,000 tonnes per year. The expansion represents a significant planned increase in Khoemacau’s copper production capacity in Botswana’s Kalahari Copper Belt.
15 hours ago