SMM Evening Comments (Apr 24): Shanghai Nonferrous Metals Closed with Losses amid Market Expectation of the Fed’s 25-basis-point Rate Hike

Published: Apr 24, 2023 18:00 (GMT+8)
Source: SMM
Shanghai nonferrous metals closed with losses in day trading.

SHANGHAI, Apr 24 (SMM) - Shanghai nonferrous metals closed with losses in day trading. The resilient US economy enhanced the market expectation that the US Fed would raise rates by another 25 basis points at the next meeting. The US dollar index fell after surging overnight.


SHFE copper fell 0.78%, aluminium dipped 0.92%, lead dropped 0.29%, zinc slip 2.55%, tin declined 1.79%, and nickel closed down 3.24%.


Copper: SHFE 2305 copper fell 540 yuan/mt or 0.78% to 68,370 yuan/mt. The open interest decreased 16,458 lots to 104,561 lots.

Due to the holding of the SMM Copper Summit, the spot trading has weakened recently. The decline in the futures prices encouraged downstream purchases. Some cargo holders were active in shipping amid the month-end and the upcoming Labour Day holiday. As a result, the premiums stood at nearly 0 yuan/mt.

Aluminium: SHFE 2306 aluminium dipped 175 yuan/mt or 0.92% to 18,835 yuan/mt. The open interest declined 2,815 lots to 262,995 lots.

On the macro level, the recovery of the Chinese economy is in stark contrast to stubbornly high inflation in the US. There are growing supply concerns. Aluminium ingot social inventory remains in a state of destocking, with downstream consumption in the peak season. However, the decline in social inventory may slow down as downstream purchases may weaken after aluminium prices have climbed above 19,000 yuan/mt. Capital may flow out of the market due to risk aversion before the upcoming Labour Day holiday. Aluminium prices are expected to lose upward momentum. 

Lead: SHFE 2306 lead dropped 45 yuan/mt or 0.29% to 15,300 yuan/mt. The open interest lost 284 lots to 65,926 lots.

SHFE lead moved sideways. Spot lead supply grew, suppressing the traders’ quotes. The spot market saw some goods quoted at discounts, encouraging downstream companies to restock on dips. The small order transactions were average today. The most-traded SHFE lead contract will move rangebound in the short term on a stable macro front.

Zinc: SHFE 2306 zinc slip 560 yuan/mt or 2.55% to 21,430 yuan/mt. The open interest added 24,436 lots to 118,475 lots.

Zinc prices crashed sharply today. The cautious traders offered quotes at the average price, while downstream companies priced over the futures prices. The overall transactions improved, but slightly lower than expected.

Tin: SHFE 2306 tin declined 3,850 yuan/mt or 1.79% to 211,670 yuan/mt. The open interest dipped 855 lots to 47,554 lots.

The spot trades improved slightly compared with last Friday. SHFE tin warrants grew 256 mt to 8,406 mt today. If the spot prices were quoted at large discounts and still failed to boost downstream purchases, the SHFE warrants may increase further.

Nickel: SHFE 2306 nickel closed down 6,090 yuan/mt or 3.24% at 181,900 yuan/mt. The open interest dropped 4,164 lots to 81,951 lots.

On April 24, premiums of Jinchuan nickel were 4,400-4,800 yuan/mt. The average premium stood at 4,600 yuan/mt, down 300 yuan/mt from the previous trading day. NORNICKEL nickel was quoted at premiums of 4,500-4,600 yuan/mt, with an average of 4,550 yuan/mt, down 150 yuan/mt from a day ago. Today, the price difference between Jinchuan nickel and NORNICKEL nickel was narrow, but the spot trading picked up slightly amid the falling futures prices in the early trading. Nickel briquette prices were 187,900-188,900 yuan/mt, down 5,250 yuan/mt from the previous trading day. The nickel briquette transactions were slack as it was still traded at premiums over nickel sulphate.



[Disclaimer: The above representation and data is based on market information SMM believes to be reliable at the time of acquiring as well as the comprehensive assessment by SMM research team, and any and all information provided in this article is for reference only. This article does not constitute a direct recommendation for investment or any decisions in any form and clients shall act on their own discreet and any decisions made by clients are not within the responsibility of SMM.]


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
16 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
16 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
17 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
17 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
17 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
17 hours ago
SMM Evening Comments (Apr 24): Shanghai Nonferrous Metals Closed with Losses amid Market Expectation of the Fed’s 25-basis-point Rate Hike - Shanghai Metals Market (SMM)