SMM Evening Comments (Mar 22): Shanghai Nonferrous Metals Closed Mixed as Market Awaits Results of Fed's March Meeting Tonight

Published: Mar 22, 2023 18:00 (GMT+8)
Source: SMM
Shanghai nonferrous metals closed mixed in day trading.

SHANGHAI, Mar 22 (SMM) - Shanghai nonferrous metals closed mixed in day trading. On the macro front, the US dollar index continued to weaken. Since the US Treasury Secretary promised to bail out the banking sector if the risks should deteriorate further, the banking turmoil in Europe and the United States has eased, and the risk aversion in the market has abated. The traders are awaiting the results of Federal Reserve's March Meeting tonight.

SHFE copper added 1.02%, aluminium gained 0.22%, lead lost 0.13%, zinc edged down 0.51%, tin ticked up 1.90%, and nickel advanced 1.41%.

Copper: The most-traded SHFE 2304 copper closed up 1.02% or 690 yuan/mt at 68,080 yuan/mt, with open interest up 4,205 lots to 157,789 lots.

In the spot market, as the backwardation of front-month contract narrowed, the goods holders held prices firm and refrained from selling. Some traders managed to bargain down prices and close deals.

Aluminium: The most-traded SHFE 2304 aluminium closed up 0.22% or 40 yuan/mt at 18,150 yuan/mt, with open interest up 12,004 lots to 220,177 lots.

On the fundamentals, the domestic supply side has recovered slightly, and the current improvement in downstream consumption has driven the rapid destocking of aluminum.

Lead: The most-traded SHFE 2304 lead closed down 0.13% or 20 yuan/mt at 15,340 yuan/mt, with open interest down 6,107 lots to 23,788 lots.

SHFE lead softened, and goods holders were not in a rush to close deals. Faced with stop premiums brought by limited supply in the market, downstream players only purchased as needed and preferred to signed long-term orders. The spot transactions barely improved.

Zinc: The most-traded SHFE 2304 zinc closed down 0.51% or 115 yuan/mt at 22,255 yuan/mt, with open interest up 4,117 lots to 98,067 lots.

Zinc prices weakened today, and the discounts/premiums remained flat from the previous trading day. Since the bearish sentiment lingered in the market, downstream enterprises refrained from purchasing, leading to slack transactions.

Tin: The most-traded SHFE 2304 tin closed up 1.90% or 3,530 yuan/mt at 189,130 yuan/mt, with open interest up 2,586 lots to 52,882 lots.

As tin futures prices picked up, more smelters to offer quotes in the morning session, but they were less willing to make shipment. The spot transactions were slack amid poor inquiries.  

Nickel: The most-traded SHFE 2304 nickel closed up 1.41% or 2,470 yuan/mt at 177,310 yuan/mt, with open interest down 2,699 lots to 54,758 lots.

In the spot market, Jinchuan nickel was quoted in premiums of 7,800-8,000 yuan/mt, with an average of 7,900 yuan/mt, up 250 yuan/mt from the previous trading day. NORNICKEL nickel was in premiums of 2,800-3,000 yuan/mt, with an average of 2,900 yuan/mt, up 50 yuan/mt from the prior trading day. The spot transactions were fewer than expected as the demand for pure nickel remained sluggish. For nickel briquette, the prices stood between 175,200-175,600 yuan/mt, up 50 yuan/mt from the previous trading day. 

[Disclaimer: The above representation and data is based on market information SMM believes to be reliable at the time of acquiring as well as the comprehensive assessment by SMM research team, and any and all information provided in this article is for reference only. This article does not constitute a direct recommendation for investment or any decisions in any form and clients shall act on their own discreet and any decisions made by clients are not within the responsibility of SMM.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
6 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
6 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
7 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
7 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
8 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
8 hours ago