Progress of New Battery Separator Projects at Sinoma Science&Technology

Published: Mar 21, 2023 16:57 (GMT+8)
Source: SMM
The project with an annual output of 1.04 billion m2 in Nanjing, Jiangsu started construction in September, 2022.

•      The project with an annual output of 1.04 billion m2 in Nanjing, Jiangsu started construction in September, 2022.

•      The Phase II project with a capacity of 320 million m2 in Inner Mongolia is ramping up, and Phase III of 720 million m2 capacity started construction in August, 2022.

•      The project with a capacity of 1 billion m2 of flat base film and 800 million m2 flat coated separator started construction in September, 2022.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Live Stream] Macro and Infrastructure Outlook, Copper and Aluminum Market Analysis, Cost Reduction through Option-Embedded Trade, AI Computing Power, Copper Foil and Optical Fiber Prospects
27 mins ago
[Live Stream] Macro and Infrastructure Outlook, Copper and Aluminum Market Analysis, Cost Reduction through Option-Embedded Trade, AI Computing Power, Copper Foil and Optical Fiber Prospects
Read More
[Live Stream] Macro and Infrastructure Outlook, Copper and Aluminum Market Analysis, Cost Reduction through Option-Embedded Trade, AI Computing Power, Copper Foil and Optical Fiber Prospects
[Live Stream] Macro and Infrastructure Outlook, Copper and Aluminum Market Analysis, Cost Reduction through Option-Embedded Trade, AI Computing Power, Copper Foil and Optical Fiber Prospects
27 mins ago
[SMM Market Flash] India Approves Capex Support for Lithium and Nickel Processing Plants
1 hour ago
[SMM Market Flash] India Approves Capex Support for Lithium and Nickel Processing Plants
Read More
[SMM Market Flash] India Approves Capex Support for Lithium and Nickel Processing Plants
[SMM Market Flash] India Approves Capex Support for Lithium and Nickel Processing Plants
India’s Union Cabinet on November 4 approved a "Capex Support Scheme to Promote Critical Mineral Processing" worth INR 28.14 billion (about US$297 million), running from FY2026-27 to FY2030-31. The scheme will back two lithium plants with at least 30,000 tonnes of capacity each and two nickel plants with at least 50,000 tonnes each, all turning ores and intermediates into high-purity compounds. Cobalt will be recovered as a by-product of nickel processing. The subsidy covers 30% of eligible investment, capped at INR 5 billion per lithium project and INR 9 billion per nickel project. Beneficiaries will be chosen through technical evaluation followed by competitive bidding. The government said the plants will serve e-mobility, battery storage, electronics, defence and specialty steel, as concentrated critical mineral mining leaves supply chains exposed.
1 hour ago
30,000 mt/year! New update on a high-compaction density LFP project in Yibin, Sichuan
1 hour ago
30,000 mt/year! New update on a high-compaction density LFP project in Yibin, Sichuan
Read More
30,000 mt/year! New update on a high-compaction density LFP project in Yibin, Sichuan
30,000 mt/year! New update on a high-compaction density LFP project in Yibin, Sichuan
Recently, the Yibin Municipal Ecology and Environment Bureau of Sichuan Province issued a public notice on the approval decisions for environmental impact assessment documents of construction projects, granting approval for the Environmental Impact Report of the 30,000 mt/year High-Compaction Density LFP Project by Yibin Tianyuan Lithium Battery New Materials Co., Ltd. The notice period runs from November 2 to November 11, 2026. The approval states that after fully implementing the environmental protection measures proposed in the EIA documents, the adverse environmental impacts of the project can be mitigated, and approval is granted in principle for Yibin Tianyuan Lithium Battery New Materials Co., Ltd. to proceed with construction in accordance with the nature, scale, location, processes, and environmental protection measures specified in the report.
1 hour ago