Sulphuric Acid Prices Stabilised in February 2023

Published: Mar 16, 2023 15:45 (GMT+8)
Source: SMM
During the month, prices for sulphuric acid derived from smelters remained stable as a whole, with the exception of the price gains in several regions driven by higher sulphur prices.

SHANGHAI, Mar 16 (SMM) - During the month, prices for sulphuric acid derived from smelters remained stable as a whole, with the exception of the price gains in several regions driven by higher sulphur prices. In terms of supply, the production of smelters was stable, and some large-scale equipment maintenance took place in Zhejiang. In terms of demand, the titanium dioxide market in some areas was improving steadily, while operating rates in the phosphate fertiliser industry did not change much as the downstream buyers had just begun stockpiling for the spring. The monoammonium phosphate market showed signs of weakening. As such, the demand for sulphuric acid has not improved noticeably.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Aranzazu Molybdenum Output Drops 28% QoQ in Q3】
55 mins ago
【Flash | Aranzazu Molybdenum Output Drops 28% QoQ in Q3】
Read More
【Flash | Aranzazu Molybdenum Output Drops 28% QoQ in Q3】
【Flash | Aranzazu Molybdenum Output Drops 28% QoQ in Q3】
Aura Minerals’ preliminary results released on Oct. 9 show that the Aranzazu mine in Mexico produced 41,000 lb, or about 18.6 tonnes, of molybdenum in Q3 2026, down 28% QoQ and 61% YoY. Nine-month output was 162,000 lb, or about 73.5 tonnes, down 1% YoY. Copper, gold and silver output all increased sequentially, indicating that the molybdenum decline was not caused by a site-wide shutdown. Aura did not separately explain the lower molybdenum output, leaving mine sequencing, molybdenum grade and recovery as key items to monitor.
55 mins ago
【Flash | El Teniente Mudslide Killed Two Workers; Output Impact Unconfirmed】
57 mins ago
【Flash | El Teniente Mudslide Killed Two Workers; Output Impact Unconfirmed】
Read More
【Flash | El Teniente Mudslide Killed Two Workers; Output Impact Unconfirmed】
【Flash | El Teniente Mudslide Killed Two Workers; Output Impact Unconfirmed】
A mudslide struck the open-pit area of Codelco’s El Teniente mine on Oct. 11, killing two contractor workers. Operations in the affected area had already been suspended because of severe weather. Cochilco data show that El Teniente produced 1,483.1 tonnes of molybdenum in H1 2026, down 34.9% from 2,277.2 tonnes a year earlier. Codelco has not said whether underground mining, concentrators or the molybdenum recovery circuit were affected, nor quantified any additional output loss. SMM is therefore not cutting its molybdenum forecast at this stage and will monitor ore feed, haulage and plant operations.
57 mins ago
Cobre Limited Secures Control of Chile Copper Mine for US$12 Million
1 hour ago
Cobre Limited Secures Control of Chile Copper Mine for US$12 Million
Read More
Cobre Limited Secures Control of Chile Copper Mine for US$12 Million
Cobre Limited Secures Control of Chile Copper Mine for US$12 Million
Cobre Limited (ASX:CBE) has secured control of Chile's Sierra Atacama copper project through a US$12 million transaction that lifts its interest to 62.86%. The asset comprises oxide copper resources planned for cathode output via solvent-extraction and electrowinning, with production ramp-up running into 2027. The deal gives Cobre operational leadership of the project and accelerates its Chilean copper development strategy, illustrating how junior miners are consolidating South American copper assets amid elevated prices.
1 hour ago