SMM Evening Comments (Mar 10): Shanghai Nonferrous Metals Closed with Losses on Upcoming US Non-farm Payrolls

Published: Mar 10, 2023 18:00 (GMT+8)
Source: SMM
Shanghai nonferrous metals closed with losses in day trading. On the macro front, the US initial jobless claims in the week ended March 4 recorded 211,000, higher than the expected 195,000, which weighed on US dollar index.

SHANGHAI, Mar 10 (SMM) - Shanghai nonferrous metals closed with losses in day trading. On the macro front, the US initial jobless claims in the week ended March 4 recorded 211,000, higher than the expected 195,000, which weighed on US dollar index. The US February non-farm payrolls after seasonal adjustment is to be released tonight, and the market expects further rate hikes if the readings remain strong.

SHFE copper added 0.71 %, aluminium slid 1.35%, lead edged down 0.16%, zinc declined 1.63%, tin tumbled 3.83%, and nickel shed 3.96%.

Copper: The most-traded SHFE 2304 copper closed down 0.71% or 490 yuan/mt at 68,810 yuan/mt, with open interest down 320 lots to 143,690 lots.

In the spot market, falling copper prices stimulated downstream enterprises to purchase, and the active transactions further lifted the spot premiums. The downstream buyers were keen on restocking over the week, which was reflected in the decline of 14,000 mt in the copper inventory in Shanghai.

Aluminium: The most-traded SHFE 2304 aluminium closed down 1.35% or 250 yuan/mt at 18,265 yuan/mt, with open interest up 10,043 lots to 196,068 lots.

Recently, the Federal Reserve has frequently made hawkish statements, putting the prices of non-ferrous metals under pressure. It is necessary to continue to pay attention to the US inflation data. Downstream operating rates and orders improved month-on-month, and the market is gradually entering peak season. However, persistently high inventory of aluminium ingots will prevent aluminium prices from going up, which may trade rangebound.   

Lead: The most-traded SHFE 2304 lead closed down 0.16% or 25 yuan/mt at 15,155 yuan/mt, with open interest up 1,084 lots to 68,263 lots.

In the spot market of secondary lead, most enterprises were still reluctant to quote when SHFE lead 2304 contract hovered at low levels. They only made shipment under long-term orders. The price gap between secondary refined lead and lead scrap narrowed to 25 yuan/mt. Therefore, secondary refined lead smelters were tough on their offers.

Zinc: The most-traded SHFE 2304 zinc closed down 1.63% or 380 yuan/mt at 22,870 yuan/mt, with open interest up 2,596 lots to 84,762 lots.

Zinc prices crashed today. Traders were cautious in quoting, but downstream enterprises were motivated to purchase on dips, allowing brisk trading in the spot market.

Tin: The most-traded SHFE 2304 tin closed down 3.83% or 7,440 yuan/mt at 186,950 yuan/mt, with open interest up 3,672 lots to 75,728 lots.

In the spot market, the most smelters quoted low amid plummeting SHFE tin prices and held prices firm. The transactions improved slightly with growing inquiries.

Nickel: The most-traded SHFE 2304 nickel closed down 3.96% or 7,400 yuan/mt at 179,670 yuan/mt, with open interest up 11,466 lots to 81,812 lots.

In the spot market, Jinchuan nickel was quoted in premiums of 6,300-7,500 yuan/mt, with an average of 6,900 yuan/mt, down 200 yuan/mt on a daily basis. NORNICKEL nickel was in premiums of 2,400-2,600 yuan/mt, with an average of 2,500 yuan/mt, down 400 yuan/mt. Nickel futures and spot prices both declined further during the week, but the spot transactions dropped due to lower-than-expected downstream deman. For nickel briquette, the prices stood between 182,300-182,800 yuan/mt, down 7,500 yuan/mt from the previous trading day. 

[Disclaimer: The above representation and data is based on market information SMM believes to be reliable at the time of acquiring as well as the comprehensive assessment by SMM research team, and any and all information provided in this article is for reference only. This article does not constitute a direct recommendation for investment or any decisions in any form and clients shall act on their own discreet and any decisions made by clients are not within the responsibility of SMM.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
9 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
9 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
10 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
10 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
10 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
10 hours ago