Supply and Demand Forecast for Manganese Sulphate in 2023

Published: Feb 3, 2023 15:44
Source: SMM
It is expected that in the third and fourth quarters of 2023, the capacity of sodium battery cathode materials will accelerate in commissioning

SHANGHAI, Feb 3 (SMM) - With the lithium and nickel prices hovering at high levels, sodium batteries and lithium iron manganese phosphate (LMFP) batteries with cost advantages have come under the spotlight.

According to SMM survey, manganese sulphate is primarily the source of manganese in the precursor of sodium batteries at present, while tricobalt tetraoxide (Mn3O4) is mostly regarded the source of manganese in the cathode materials for LMFP batteries.

It is expected that in the third and fourth quarters of 2023, the capacity of sodium battery cathode materials will accelerate in commissioning. However, it should be noted that the application of sodium batteries are limited, mainly including two-wheeled vehicles, low-speed passenger vehicles, and energy storage. Therefore, the capacity release of sodium batteries will fall short of the ternary batteries, and the supply deficit of manganese sulphate will be unlikely.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
15 hours ago
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
Read More
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] On March 12, 2026, the US International Trade Commission (ITC) ruled against imposing tariffs on graphite imports from China. Below is the complete timeline of the US anti-dumping and countervailing duty (AD/CVD) investigation into China’s active anode material (graphite anode) imports, the duty rates at each stage, and the latest outcome as of March 12, 2026.
15 hours ago
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
17 hours ago
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Read More
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Recently, the National Development and Reform Commission (NDRC) issued the Reply on the Approval of the Hami–Dunhuang Third 750 kV Transmission Line Project, formally approving the Xinjiang Hami–Dunhuang Third 750 kV Transmission Line Project. The implementation of this project was of great significance for improving the backbone structure of the main power grid in Northwest China, strengthening the mutual support capacity between the Gansu and Xinjiang power grids, and enhancing Xinjiang’s capacity to absorb new energy. According to previously disclosed environmental impact assessment information, the project had a total static investment of 1.3509 billion yuan and was scheduled for completion in March 2027.
17 hours ago
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
17 hours ago
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Read More
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
On March 12, it was learned from State Grid Jilin Electric Power Co., Ltd. that the project to transmit power from the Songliao Clean Energy Base in Northeast China to North China (the “Jijing UHV DC Project”) officially entered the final stage of the feasibility study. According to the plan, the project is expected to complete project approval in 2026, enter the substantive construction phase in 2027, and be completed and put into operation in 2029.
17 hours ago
Supply and Demand Forecast for Manganese Sulphate in 2023 - Shanghai Metals Market (SMM)