Shanghai Continues to Provide New Energy Vehicle Replacement Subsidies

Published: Jan 29, 2023 10:30
Individual consumers who scrap or transfer their passenger cars registered in Shanghai in line with relevant standards and purchase pure electric vehicles before June 30, 2023 will enjoy a subsidy of 10,000 yuan per vehicle.

SHANGHAI, Jan 29 (SMM) - On January 28, the Shanghai Municipal People's Government issued the Action Plan for Improving Confidence, Expanding Domestic Demand, Securing stable Growth, and Promoting Development, with the aim to boost the consumption of commodities like automobile and home appliances.

According to the document, the new energy vehicle replacement subsidies still remain in place. To be specific, individual consumers who scrap or transfer their passenger cars registered in Shanghai in line with relevant standards and purchase pure electric vehicles before June 30, 2023 will enjoy a subsidy of 10,000 yuan per vehicle.

At the same time, individual consumers who purchase green smart home appliances will be given a one-off subsidy of 10% of the payment amount (a maximum of 1,000 yuan).

Moreover, it is also pointed out that various tax preferential policies will be fully implemented. For example, new energy vehicles that are purchased between January 1, 2023 and December 31, 2023 and listed in the purchase tax-free catalogues will be exempt from purchase tax, including pure electric vehicles, plug-in hybrid (including extended range) vehicles, and fuel cell vehicles.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
19 hours ago