Copper Inventories across Major Chinese Markets Add 5,000 mt from January 6

Published: Jan 9, 2023 17:55
Source: SMM
As of Monday January 9, SMM copper inventory across major Chinese markets stood at 122,500 mt, up 5,000 mt from last Friday and 36,100 mt from the same period last year when the data was 86,400 mt.

SHANGHAI, Jan 9 (SMM) - As of Monday January 9, SMM copper inventory across major Chinese markets stood at 122,500 mt, up 5,000 mt from last Friday and 36,100 mt from the same period last year when the data was 86,400 mt. Over the weekend, the inventories in Shanghai, Guangdong, Jiangsu and Tianjin grew, while those in Jiangxi, Sichuan and Chongqing remained unchanged from last Friday. In detail, the inventory in Shanghai added 300 mt to 83,700 mt, the inventory in Guangdong rose 2,300 mt to 8,700 mt, the inventory in Jiangsu grew 2,200 mt to 23,600 mt, the inventory in Tianjin increased 300 mt to 1,300 mt, while the inventory in Zhejiang dropped 100 mt to 4,200 mt.

The continuous increase in the number of COVID-19 patients hindered the production. Besides, after the New Year's Day holiday, factories across the country successively started an early Chinese New Year holiday in advance, which further pushed up the copper inventory in various places. Smelters ramped up the shipments to east China and south China to dump their in-plant inventories approaching the Chinese New Year holiday.

SMM believes that the arrivals of domestic copper will edge higher this week amid the smelters’ dumping of inventories. Some sources will be shipped for delivery as the SHFE 2301 copper will be delivered next Monday. Processing enterprises are cautious about buying raw materials before the Chinese New Year, and the overall consumption weakens amid the high copper prices. SMM presumes that the copper inventory will continue to grow this week.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Sep 07)
4 hours ago
Data: SHFE, DCE market movement (Sep 07)
Read More
Data: SHFE, DCE market movement (Sep 07)
Data: SHFE, DCE market movement (Sep 07)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 07 Sep , 2026
4 hours ago
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
5 hours ago
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Read More
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
The 300,000 mt/year copper cathode expansion project of JCC Hongyuan Copper, a subsidiary of Jiangxi Copper Corporation, entered the pre-approval public notice stage of its environmental impact assessment on September 4, with a total investment of approximately 1.416 billion yuan. The project is planned to start construction in September 2026 and be completed in December 2027. Upon completion, JCC Hongyuan's total capacity will jump from 250,000 mt to 550,000 mt.
5 hours ago
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
5 hours ago
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
Read More
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
Panoro Minerals has reported new assay results from its Cotabambas copper-gold-silver project in southern Peru, with drill hole CB-230 intersecting 808.15 metres grading 0.22% copper, 0.10 g/t gold and 1.53 g/t silver, equivalent to 0.31% CuEq using Panoro’s stated metal-price and metallurgical-recovery assumptions. The interval was encountered from 296.35 metres to 1,104.50 metres downhole. Within the broader mineralised interval, CB-230 returned 240.15 metres grading 0.32% copper, including 156.50 metres at 0.38% copper and a higher-grade 48.10-metre interval at 0.57% copper, 0.25 g/t gold and 4.08 g/t silver. Drill hole CB-229 separately intersected 303.30 metres at 0.14% copper, including 69.90 metres at 0.27% copper. Panoro said the latest drilling, together with previously reported hole CB-228, indicates continuity of the higher-grade mineralisation across approximately 600 metres of strike and from surface to more than 1,100 metres depth. Mineralisation remains open, and additional holes CB-231, CB-232 and CB-233 have commenced to test further extensions around and below the South Pit. The latest results strengthen Panoro’s geological case for expanding the higher-grade component of the Cotabambas resource, particularly as drilling has yet to define the limits of mineralisation around the South Pit. Cotabambas currently hosts 507.3 Mt of indicated resources and 496.0 Mt of inferred resources, with a higher-grade component of 129.0 Mt indicated and 93.1 Mt inferred. However, the project remains in the exploration and development stage, meaning the new intersections have no immediate impact on copper supply and will need to be incorporated into future resource modelling and technical studies before their economic significance can be assessed.
5 hours ago