Chinese Lithium Carbonate Imports Rose 50% MoM in Nov with Imports from Chile Returning to Normal

Published: Dec 22, 2022 10:31
Source: SMM
According to customs data, Chinese lithium carbonate imports stood at 12,412 mt in November, up 50% MoM and 203% YoY. In terms of country of origin, imports from Chile added 69% MoM, but those from Argentina fell 31% MoM.

SHANGHAI, Dec 22 (SMM) - According to customs data, Chinese lithium carbonate imports stood at 12,412 mt in November, up 50% MoM and 203% YoY. In terms of country of origin, imports from Chile added 69% MoM, but those from Argentina fell 31% MoM. The average import price stood at $53,673/mt in November 2022, an increase of 6% month-on-month and 298% year-on-year.

Among them, the average price of imported lithium carbonate from Chile was $56,296/mt, a slight increase of 1% from October. In terms of the destinations of the imports, 51% of Chinese total imports of lithium carbonate went to Shanghai, 37% to Guangdong, 6% to Jiangsu, and 4% to Fujian. The imports totalled 125,216 mt from January to November 2022, a year-on-year increase of 70%.

China exported 8,877 mt of lithium hydroxide in November 2022, a month-on-month drop of 9% and year-on-year increase of 49%. Among them, exports to South Korea fell 18% from the previous month, and those to Japan rose 6% MoM. The average export price was $48,652/mt in November 2022, a gain of 3% month-on-month and a surge of 286% year-on-year. The average price of lithium hydroxide exported to South Korea was $59,408/mt, and that exported to Japan was $28,620/mt. From January to November 2022, Chinese exports of lithium hydroxide totalled 84,620 mt, a year-on-year increase of 28%.

China imported 350,341 mt of spodumene concentrate in physical content in November 2022, up 63% on the month. The imports from Australia recorded 298,523 mt, accounting for about 85% of the monthly import volume. In terms of the destinations of the imports, 53% of imports went to Sichuan province, 22% Jiangxi province, 12% Shanghai, and 7% Jiangsu province. From January to November 2022, the combined imports of spodumene concentrate stood at 2,532,164 mt in physical content (equivalent to about 316,500 mt LCE).

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
18 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
18 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
18 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
18 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
18 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
18 hours ago