SMM Evening Comments (Dec 9): Shanghai Nonferrous Metals Closed with Gains amid Boosted Market Confidence

Published: Dec 09, 2022 18:00 (GMT+8)
Shanghai nonferrous metals closed with gains in day trading. On the macro front, the domestic pandemic prevention and control measures loosened further under the newly issued “10 Measures”, and it is emphasised at this week's Political Bureau meeting to “maintain stable growth”, enhancing the expectations for economic restoration.

SHANGHAI, Dec 8 (SMM) – Shanghai nonferrous metals closed with gains in day trading. On the macro front, the domestic pandemic prevention and control measures loosened further under the newly issued “10 Measures”, and it is emphasised at this week's Political Bureau meeting to “maintain stable growth”, enhancing the expectations for economic restoration.

Shanghai copper rose 1.67%, aluminium added 0.36%, lead gained 0.51%, zinc jumped 0.71%, tin advanced 1.41%, and nickel climbed 3.22%.

Copper: The most-traded SHFE 2301 copper closed up 1.67% or 1,100 yuan/mt at 67,120 yuan/mt, with open interest up 3,699 lots to 148,592 lots.

On the macro front, the US dollar index continued to weaken overnight, boosting copper prices. This week, the domestic pandemic prevention and control measures loosened further under the newly issued “10 Measures”, and it is emphasised at this week's Political Bureau meeting to “maintain stable growth”, enhancing the expectations for economic restoration.

In the spot market, SHFE 2212 gained nearly 1.07% today, weighing on downstream purchases and consumption, and the spot market was dominated by the traders trying to force down the prices. Spot premiums in Shanghai dropped for two consecutive days, especially when some traders were looking for low-priced sources. The spot premiums are expected to be subject to the SHFE front-month and next-month spread again next week as SHFE 2212 is about to be delivered.

Aluminium: The most-traded SHFE 2301 aluminium closed up 0.36% or 70 yuan/mt at 19,260 yuan/mt, with open interest down 4,364 lots to 203,554 lots.

On the supply side, the domestic operating aluminium capacity continued to rise in December, driven by restarts in Sichuan and Guangxi, as well as release of new capacity in Inner Mongolia and Gansu. And because of winter and approaching New Year’s Day, aluminium smelters raised the proportion of ingots. On the demand side, the downstream consumption was poor in the traditional off-season. Some aluminium processing plants plan to close early for the Chinese New Year. Therefore, aluminium ingot inventory, albeit still at a low level, may accumulate in the future, putting aluminium prices at risk of pulling back.

Lead: The most-traded SHFE 2301 lead closed up 0.51% or 80 yuan/mt at 15,810 yuan/mt, with open interest down 2,551 lots to 68,615 lots.

The cargo holders were lacklustre in making shipments amid wide spread between futures and spot prices, and there were few quotes heard in the spot market. The downstream players mainly purchased with long-term orders. The secondary refined zinc output is expected to fall to 292,100 mt in December as some secondary smelters reduced or stopped the production. SHFE lead is likely to be rangebound should there be no major events on the macro front.

Zinc: The most-traded SHFE 2301 zinc closed up 0.71% or 175 yuan/mt at 24,965 yuan/mt, with open interest up 152 lots to 119,678 lots.

SHFE zinc was relatively strong today with the active involvement of longs. SMM zinc ingot social inventory across seven markets in China totalled 53,700 mt as of Friday December 9, down 800 mt from this Monday, alluding lingering supply tightness in the spot market.

Tin: The most-traded SHFE 2301 tin closed up 1.41% or 2,770 yuan/mt at 198,650 yuan/mt, with open interest up 6,165 lots to 53,920 lots.

In the spot market, some smelters were not interest in making quotes in early trade, but the shipments of mainstream smelters were smooth. The spot premiums/discounts offered by the traders were low, and the market transactions were again weighed on by high prices. Some traders failed to clinch a deal by noon time. The downstream players still mainly purchased on rigid demand.

Nickel: The most-traded SHFE 2301 nickel closed up 3.22% or 6,920 yuan/mt at 221,520 yuan/mt, with open interest down 3,267 lots to 88,895 lots.

In the spot market, Jinchuan nickel was in premiums of 7,700-8,000 yuan/mt, with an average of 7,850 yuan/mt, up 100 yuan/mt from the previous trading day. NORNICKEL nickel was in premiums of 5,700-6,000 yuan/mt, with an average of 5,850 yuan/mt, down 50 yuan/mt on a daily basis. The import losses now were as high as 31,000 yuan/mt, and there were few transactions in the market amid scarce supply. For nickel briquette, the prices stood between 219,000-220,900 yuan/mt, down 100 yuan/mt from the previous trading day.

[Disclaimer: The above representation and data is based on market information SMM believes to be reliable at the time of acquiring as well as the comprehensive assessment by SMM research team, and any and all information provided in this article is for reference only. This article does not constitute a direct recommendation for investment or any decisions in any form and clients shall act on their own discreet and any decisions made by clients are not within the responsibility of SMM.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)