Yellow Phosphorus Prices to Sustain Gains after the National Day Holiday amid Broad-Based Production Curtailment in Yunnan

Published: Sep 29, 2022 15:19
Source: SMM
SHANGHAI, Sep 29 (SMM) - In compliance with the Energy Efficiency Management Plan for Energy Consumption Industries from September 2022 to May 2023 formulated by relevant departments of Yunnan Province, yellow phosphorus enterprises in Yunnan shall reduce or stop their production in an all-round way from 0:00 on September 26.

SHANGHAI, Sep 29 (SMM) - In compliance with the Energy Efficiency Management Plan for Energy Consumption Industries from September 2022 to May 2023 formulated by relevant departments of Yunnan Province, yellow phosphorus enterprises in Yunnan shall reduce or stop their production in an all-round way from 0:00 on September 26. As of September 28, the daily output of yellow phosphorus in Yunnan was 805 mt, a decrease of about 580 mt or 41.87% from mid-September. 

The document has categorised the province's energy efficiency management into two grades: 3 million kilowatts and 4.5 million kilowatts. The enterprises involved are required to comply with the energy efficiency management indicators on the basis of the benchmark load before September 25, 2022, and shall adjust their power load according to the electricity supply and demand in Yunnan in the future. The energy efficiency management list targets 37 enterprises in yellow phosphorus, cement, lead, zinc and other industries. 

Yellow phosphorus inventories are currently at a low level due to supply shock caused by the power rationing, which has fuelled bullish sentiment and left suppliers reluctant to sell. Downstream restocking after the National Day holiday will tighten the supply further and send its prices even higher.   

Some market players said that Guizhou and Sichuan may also introduce similar energy consumption and production restrictions due to the approaching dry season, which will further reduce the production of yellow phosphorus. 
As of September 28, the spot price of yellow phosphorus climbed to 34,900-36,900 yuan/mt, and the average price gained 400 yuan/mt in a single day to 35,900 yuan/mt. In just two trading days, the spot price of yellow phosphorus had risen by 500 yuan/mt, and soared 9,350 yuan/mt or 35.22% from August 5. 

It should be noted that Yunnan issued the Notice on Firmly Commit to Energy Consumption Double Control in the same period last year. Due to high energy consumption, yellow phosphorus enterprises were required that their monthly average output from September to December 2021 shall not exceed 10% of that in August.  

The sharp supply contraction, combined with the arrival of the farming season, once sent yellow phosphorus prices to a three-year high of 62,776 yuan/mt in last September.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
22 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
22 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
22 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
22 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
22 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
22 hours ago