World’s First Automated Lithium Metal Battery Production Line in Operation!

Published: Sep 22, 2022 11:43 (GMT+8)
Recently, it is announced at the 2022 National Innovation and Entrepreneurship Week’s "Lithium Metal Battery Innovation Technology Forum” that, an automated lithium metal battery manufacturing production line with international competitiveness is officially launched in Hefei city, Anhui province!

SHANGHAI, Sep 22 (SMM) - Recently, it is announced at the 2022 National Innovation and Entrepreneurship Week’s "Lithium Metal Battery Innovation Technology Forum” that, an automated lithium metal battery manufacturing production line with international competitiveness is officially launched in Hefei city, Anhui province! It is reported that the lithium metal battery is developed and manufactured by the start-up company Mengwei Technology. It is its third-generation product, and the first automated lithium metal battery production line in China and even in the world. It marks another major progress in the large-scale mass production achieved by a new generation of power battery technology enterprises through independent R&D.  The energy density of lithium metal batteries off this production line exceeds 500Wh/kg, which is expected to more than double the cruising range of electric vehicles in the future.

The energy density of the third-generation product delivered by Mengwei Technology has increased from 450Wh/kg to 500Wh/kg, with better test performance under low pressure and wide temperature difference conditions in the near space environment. Mengwei Technology has completed the delivery of the 6th batch of lithium metal battery products, which will be used in a new generation of high-altitude long-endurance aircraft. Lithium metal batteries use pure lithium metal as the anode material and use solid electrolytes instead of liquid electrolytes. Solid-state batteries are considered to be the most promising new generation of lithium-based power batteries because they can substantially improve the energy density and safety.  Its core advantages are:

1. Higher energy density. It is estimated that its single-battery energy density can reach as high as 900Wh/kg, which is expected to completely solve the problem of mileage anxiety.

2. Higher safety. Many inorganic solid electrolytes are non-flammable, while polymer solid electrolytes have certain flammability risks, but their safety is still greatly better compared to liquid electrolytes.

Judging from the current industrial layout, international car makers like Toyota, BMW, Volkswagen, Hyundai are actively deploying in the field of solid-state batteries. And battery manufacturers such as CATL, BYD, Gotion Hi-Tech, and Fuxin Dare Automotive have stepped into this field as well. In addition, companies such as Easpring Material Technology, Tianqi Lithium, Ruitai New Materials, Sunwoda, Growth Enterprise Market, and Tianci Materials are in the R&D process of solid-state battery materials. Lead Intelligent Equipment said that it has started the positioning and technical reserves of solid-state battery production equipment. And more companies such as Jinlongyu and Hongdou have entered the industry.

Toyota expects to achieve mass production and application by 2025; Honda and Nissan both stated that their all-solid-state battery production lines will be put into operation by 2024; LG Energy Solutions expects to achieve all-solid-state battery mass production by 2026. Ouyang Minggao, academician of the Chinese Academy of Sciences and vice-chairman of the ChinaEV 100, said the mass production and commercial application of solid-state batteries is expected between 2025-2030. The road to mass production of solid-state batteries is slow, and there are still some pain points:

1. All solid-state lithium batteries are immature, and huge investment is required to build new production lines. The yield rate is extremely low with significantly high cost. It is unlikely to match the public's purchasing power and thus cannot achieve large-scale production.

2. The conductivity of the solid electrolyte is only one tenth of that of the liquid electrolyte, and the fast charging efficiency is poor. 

3. The production cost of innovative materials such as pre-lithiated silicon carbon anode or vision lithium metal anode, high-nickel cathode material, solid electrolyte is much higher than the current corresponding materials, which is a deviation from the current trend of cost reduction.

At present, lithium-ion batteries represented by LFP and ternary batteries are still the main technology routes for electric vehicles, but safety and energy density are the two major shortcomings. The solid-state lithium metal battery can greatly alleviate the "safety anxiety" and "mileage anxiety" during the development of new energy vehicles. But the development of solid-state batteries still depends on the improvement of technology and the progress of commercialisation after the technical route has been decided.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Solis starts lithium drilling at Campo Grande
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Solis starts lithium drilling at Campo Grande
Read More
[SMM News] Solis starts lithium drilling at Campo Grande
[SMM News] Solis starts lithium drilling at Campo Grande
Solis Minerals has started diamond drilling at its Campo Grande Lithium Project in Brazil's Araçuaí-Salinas Lithium Valley. The company plans five holes totalling about 1,000 m, with planned depths of up to 200 m, to test lithium pegmatites across a 500 m corridor. The targets rest on coincident multi-element geochemical anomalies at surface and on historical auger drilling results. Historical work by Rio Tinto and later mapping and geochemical work by Solis defined the targets. Solis has also mapped a new pegmatite swarm of three coherent outcrop zones between planned holes DHCG-001 and DHCG-004. The program will test the continuity, geometry and lithium potential of the pegmatites beneath surface, starting where mapped pegmatites coincide with geochemical anomalies. Solis says Campo Grande's geology and geochemistry are comparable to PLS Group's Colina Lithium Project, about 100 km to the southwest. Separately, Solis has completed seven drill holes at its Mandacaru Lithium Project in Brazil, with assay results pending.
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Read More
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Charger Metals has mobilized a second drill rig to its Lake Johnston Lithium Project in Western Australia as part of a 10,000 m program targeting resource growth. Diamond and reverse circulation rigs are now operating at the Medcalf lithium deposit, and RC drilling began just over a week ago. The program will double the meters drilled at Medcalf. The drilling targets extensions and infill at the Medcalf inferred mineral resource estimate of 10.6 Mt grading 1% Li₂O. Drilling has further defined the Medcalf West Exploration Target of 3-5 Mt at 1-1.4% Li₂O. The program also aims to provide diamond core for metallurgical and geotechnical test work. Following the recent Medcalf resource upgrade, which raised contained Li₂O by 34%, Charger's board has committed to a Scoping Study on the Lake Johnston Project. The current resource sits on a predominantly 40 m x 80 m drilling grid, including 10,936 m of drilling at a cost of $32 per tone of contained Li₂O. The program is fully funded from Charger's sale of the Bynoe Lithium Project to Core Lithium for $3.75 million cash, received on 17 July 2026. Lake Johnston lies 450 km east of Perth in the Yilgarn Province, about 70 km from the Earl Grey Lithium Project, where Covalent Lithium began mining and commissioning in March 2024.
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Sep 25, 2026 15:14 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Read More
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
On September 23(rd), Savannah Resources raised US$30 million for its Barroso Lithium Project in Portugal, via 408 million shares at £0.055/share, including US$11.2 million from subscription agreements with major shareholders. Combined with US$15.5 million cash on hand, funds go toward long lead item fabrication, access road works, EPCM contracting, plant engineering, permitting, and land use rights. Barroso's July 2026 phase one DFS outlined a 14-year mine life at 183,000 t/y lithium oxide, 5.5% grade, based on US$1,788/t pricing yielding US$3.2 billion EBITDA, US$1.9 billion free cash flow, and US$913 million post-tax NPV. The deposit holds 39 million tones at 1.05% Li2O for 411,900 tones contained, Europe's largest hard-rock spodumene resource. The funding advances one of the few large-scale hard-rock lithium sources under development outside China linked African and South American supply chains, feeding EU critical raw material diversification targets.
Sep 25, 2026 15:14 (GMT+8)