The Arrivals of Cobalt-Based Raw Materials at Ports Rose Sharply in July, and Are Expected to Be Stable in August

Published: Sep 14, 2022 14:12
Source: SMM
SHANGHAI, Sep 14 (SMM) - According to lastest update of General Administration of Customs, China imported 10,000 mt of cobalt-based raw materials in metal content in July, up 42% MoM and 37% YoY.

SHANGHAI, Sep 14 (SMM) - According to lastest update of General Administration of Customs, China imported 10,000 mt of cobalt-based raw materials in metal content in July, up 42% MoM and 37% YoY. 

In detail, China imported 136 mt in metal content (converted to 8% grade) of cobalt ore in July, down 32% MoM and 2% YoY.

Imports of cobalt hydrometallurgy intermediate products were 9,600 mt in metal content (converted to 30% grade), up 48% MoM and 43% YoY.

Imports of unwrought cobalt were 339 mt in metal content in March (converted to 99.8% grade), up 57% MoM and down 20% YoY.

The average import price of cobalt hydrometallurgy intermediate products was $61,405/mt (Co content) in July 2022, down 25% MoM. 

Zhejiang, Jiangxi and Guangdong are the top three importing regions. And it is worth noting that the imports by Jiangxi surged 243% MoM, the largest increase among all, while the TOP5 importing regions all recorded a MoM growth in import volume. 
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago