New Energy Vehicle Market Fully Recovered in June, and Tesla Sales Soared 647% Month-on-Month

Published: Jul 25, 2022 13:26
Source: SMM
SHANGHAI, Jul 25 (SMM) - According to statistics, 501,000 new energy passenger vehicles were sold in June, a sharp increase of 129% from 218,000 units in the same period last year, and a 63% increase from this May.

SHANGHAI, Jul 25 (SMM) - According to statistics, 501,000 new energy passenger vehicles were sold in June, a sharp increase of 129% from 218,000 units in the same period last year, and a 63% increase from this May. The sales of pure electric vehicles were 400,000 units, accounting for 80% of the total sales, up 65% month-on-month and 125% year-on-year, while the sales of plug-in hybrid vehicles were 100,000 units, accounting for 20%, up 56% month-on-month and 156% year-on-year.
As for the performance of car companies, the top 15 car companies in terms of sales sold 426,000 vehicles in total in June, an increase of 64% month-on-month and a year-on-year increase of 133%, with a concentrate rate of 83%. BYD’s sales were outstanding again in June, with 130,000 units sold, an increase of 28% month-on-month and a year-on-year increase of 268%. It was reported that some popular car models of the company were not available for delivery until several months later, but consumers were still enthusiastic in placing orders in advance. Tesla sold 77,262 units in June, an increase of 647% month-on-month and a year-on-year increase of 171%. The company's sales in the second quarter declined for the first time in two years mainly due to the previous production suspension of its Shanghai factory. In order to make up for the missed sales in the second half of the year, Tesla announced that it would suspend the production for two weeks in July to transform its production lines. It is expected that Tesla's production capacity will be improved to a higher level after the transformation is done. FAW-Volkswagen sold 10,411 units in June, an increase of 78% month-on-month and a year-on-year increase of 164%, after suffering huge losses in March and April when the resurgence of pandemic occurred in Changchun. 
Thanks to the production resumption in Shanghai, Shanghai Volkswagen also recovered from the inactivity. In June, the sales of the company were 9,939 units, an increase of 143% on the month and 110% on the year.
In terms of performance by models, the sales of Tesla Model Y ranked first for the first time, with a record high of more than 50,000 units in June, a sharp month-on-month increase of 739% and up 351% year-on-year. The sales of Tesla's Model 3 were 25,000 units, up 515% month-on-month or 50% year-on-year, ranking the fifth. Since May, the production capacity of Tesla's Shanghai factory has basically recovered. The high demand that was accumulated in the past two months, coupled with various subsidies and preferential policies from local governments, drove Tesla's sales in June to skyrocket. As for BYD Qin PLUS, whose production lines at Changsha plants were under rectifications, sold 10,355 units in July, up 46% year-on-year but down 8% month-on-month.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
7 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
7 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
7 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
7 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
7 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
7 hours ago