SMM Evening Comments (Jul 5): Shanghai Nonferrous Metals Closed Mixed on Easing Market Sentiment

Published: Jul 05, 2022 18:00 (GMT+8)
Shanghai nonferrous metals closed mixed as the economic readings were still less cheering. The US ISM manufacturing PMI registered 53 in June, a new low since June 2020, compared to estimate 54.9 and previous reading 56.1.

SHANGHAI, Jul 5 (SMM) – Shanghai nonferrous metals closed mixed as the economic readings were still less cheering. The US ISM manufacturing PMI registered 53 in June, a new low since June 2020, compared to estimate 54.9 and previous reading 56.1.

Shanghai copper fell 1.85%, aluminium lost 2.81%, lead dropped 0.76%, zinc gained 1.8%, tin shed 1.16%, and nickel rose 0.55%.

Copper: The most-traded SHFE 2208 copper closed down 1.85% or 1,130 yuan/mt at 60,110 yuan/mt, with open interest up 1,376 lots to 155,659 lots.

On the macro front, the US ISM manufacturing PMI registered 53 in June, a new low since June 2020, compared to estimate 54.9 and previous reading 56.1. The new orders index fell below 50.

In the spot market, purchases were not quite active, and the spot premiums kept falling. But the backwardation of SHFE front-month and next-month contract, which was less than 100 yuan/mt, appealed the traders to restock, underpinning the spot premiums. In morning trade, standard-quality copper was in premiums of 100 yuan/mt with few transactions, then the goods holders lowered the premiums to 80-90 yuan/mt, but the transactions were still sluggish. In afternoon trade, there were sources in premiums of 70 yuan/mt, and some were traded at 60 yuan/mt as traders forced down the prices. The market could hardly hold firm to the prices with the constant inflow of imports.

Aluminium: The most-traded SHFE 2208 aluminium closed down 2.81% or 535 yuan/mt to 18,485 yuan/mt, with open interest up 11,742 lots to 193,265 lots.

Aluminium supply is still on the rise, while the latest social inventory statistics result showed that aluminium social inventory has stopped falling. Aluminium billet inventory also rose with a weekly increase of 2,300 mt, indicating the impact of seasonal low. Aluminium prices are still pressured on the fundamentals, and are expected to fall in the near term.

Lead: The most-traded SHFE 2208 lead closed down 0.76% or 115 yuan/mt at 14,955 yuan/mt, with open interest up 1,421 lots to 52,536 lots.

In the spot market, discounts of smelters narrowed slightly after lead prices fell, but the downstream turned away from the high prices, and the transactions with small orders were still think. The market shall watch if the cost of secondary refined lead could offer strong support.

Zinc: The most-traded SHFE 2208 zinc closed up 1.8% or 410 yuan/mt at 23,130 yuan/mt, with open interest up 5,902 lots to 118,485 lots.

SHFE zinc rose slightly in the morning when US dollar index dropped, but lost some of its gains when the index surged in the afternoon. In addition, the lingering pandemic in Shanghai and Beijing still suppressed the confidence of longs to some extent, though the impact is weakening marginally.

Tin: The most-traded SHFE 2208 tin closed down 1.16% or 2,250 yuan/mt at 191,810 yuan/mt, with open interest up 4,017 lots to 51,805 lots.

In the spot market, smelters’ quotes were relatively stable in morning trade, and were less firm to their prices despite rebounding futures prices. The premiums offered by traders were flat from yesterday, and the overall transactions were modest. SHFE warrants fell 96 lots to 3,723 lots, and LME tin inventory rose 24 mt to 3,585 mt on July 4.

Nickel: The most-traded SHFE 2208 nickel closed up 0.55% or 920 yuan/mt at 168,790 yuan/mt, with open interest up 3,862 lots to 76,810 lots.

The subsiding expectations for further rate hikes recently boosted nickel prices to some extent.

On the supply side, traders were generally wait-and-see amid greatly fluctuating nickel prices recently, and the purchasing of Jinchuan nickel by traders were less than expected, resulting in less sources available in Shanghai.

On the demand side, the market sentiment has been affected by resurging pandemic in Wuxi over the weekend, but the impact is unlikely to last long or stay strong. The transaction in Foshan, after the typhoon Chaba, has returned to normal, with the local market being little affected. In terms of alloy, the downstream was generally bearish on nickel prices, which, coupled with few orders except the military sector, resulted in less demand for nickel.

Nickel prices are likely to remain rangebound amid weak demand and rising primary nickel supply in the long run.

[Disclaimer: The above representation and data is based on market information SMM believes to be reliable at the time of acquiring as well as the comprehensive assessment by SMM research team, and any and all information provided in this article is for reference only. This article does not constitute a direct recommendation for investment or any decisions in any form and clients shall act on their own discreet and any decisions made by clients are not within the responsibility of SMM.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)