CATL Unveils CTP3.0 "Qilin" Battery, Which Holds 13% More Power than 4680 Battery

Published: Jun 23, 2022 16:14
SHANGHAI, Jun 23 (SMM) - CATL published an article on its official Weibo on June 23, saying that its newly unveiled CTP3.0 “Qilin” battery set a record high in the globe in terms of its system integration, features a volume utilisation rate of more than 72%, and energy density of 255Wh/kg, allowing cars to travel 1,000 km on a single charge.

SHANGHAI, Jun 23 (SMM) - CATL published an article on its official Weibo on June 23, saying that its newly unveiled CTP3.0 "Qilin" battery set a record high in the globe in terms of its system integration efficiency, features a volume utilisation efficiency of more than 72%, and energy density of 255Wh/kg, allowing cars to travel 1,000 km on a single charge. Due to the world's first large-surface cooling technology for battery cells, CTP3.0 "Qilin"  battery is able to support 5-minute fast hot start and 10-minute fast charge. Under the same chemistry system and the same battery pack size, the "Qilin"  battery holds 13% more power than 4680 battery, and achieves a significant boost as regards driving range, fast charging, safety,  battery life, efficiency, and low-temperature performance. The "Qilin"  batteries will be mass-produced and available for sale in 2023.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
16 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 hours ago
CATL Unveils CTP3.0 "Qilin" Battery, Which Holds 13% More Power than 4680 Battery - Shanghai Metals Market (SMM)