Lithium Fluorophosphate Prices Fell below 300,000 yuan/mt, Lithium Metal Prices Dropped to 3 Million yuan/mt

Published: May 23, 2022 14:12
Source: SMM
SHANGHAI, May 23 (SMM) - According to SMM spot prices, the prices of lithium carbonate and lithium hydroxide remained stable last week.

SHANGHAI, May 23 (SMM) - According to SMM spot prices, the prices of lithium carbonate and lithium hydroxide remained stable last week. The prices of battery-grade lithium carbonate remained stable at 450,000-473,000 yuan/mt, with an average price of 461,500 yuan/mt; the spot prices of lithium hydroxide remained stable at 460,000-475,000 yuan/mt, with an average price of 467,500 yuan/mt. In terms of lithium metal, the decline in spot price of lithium metal narrowed last week. From May 16 to May 20, the spot price of metal lithium dropped by 20,000 yuan/mt, and the average price fell to 3.005 million yuan/mt, down 0.67%.

The spot price of spodumene concentrate (6%, CIF China) stabilised last week after the previous rapid rise, and stood at $4,680-4,830/mt, with the average price at $4,755/mt.

The spot price of lithium hexafluorophosphate, which soared last year, has been falling all the way down since March 9. The average price fell below 300,000 yuan/mt. As of May 20, the spot price of lithium hexafluorophosphate fell to 285,000-306,000 yuan/mt, with an average price of 295,500 yuan/mt.

Regarding the price trend in the future, SMM believes that lithium hexafluorophosphate prices will continue to fall due to plentiful supply of raw materials and weak demand.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
16 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 hours ago