Professional manufacturer of iron removal equipment, Ningbo Ximeng Magnetic Industry Development Co., Ltd., with you about 2022, the Seventh China International New Energy Conference

Published: Apr 8, 2022 14:07
Source: SMM

In the context of the dual-carbon era, various industries to speed up the development of green low-carbon economy, speed up the development of new energy is an important measure to achieve carbon peak, carbon neutralization goals and build a new development pattern. SMM expects sales of new energy vehicles to grow by 25 per cent between 2021 and 2025. The high growth trend of the new energy market also provides good development opportunities for related enterprises in other segments of the industrial chain. At a time of increasingly fierce competition in the industry, SMM will hold the "2022 (Seventh) China International New Energy Conference" in Chengdu from April 27 to 29, 2022. As a professional manufacturer of iron removal equipment, Ningbo West Magnetic Industry Development Co., Ltd. will dress up as a sponsor to provide equipment support for the industry.

Ningbo West Magnetic Industry Development Co., Ltd. (stock code: 836961) was founded in 2003, located in Ningbo, Zhejiang Province, China, is a comprehensive professional manufacturer of magnetic application products, specializing in the research, design and production of magnetic filters and various magnetic application components.

Main products: magnetic rod, magnetic frame, fluid pipe iron remover, drawer iron remover, rotary iron remover, program controlled pneumatic iron remover.

In line with the enterprise tenet of "high efficiency, perfection, harmony and dedication" and the enterprise slogan of "whoever goes through my hands, it will be a good product", with years of research, design, manufacturing and sales experience in the field of magnetic products, the company's products have been recognized by many customers at home and abroad. We will sincerely look forward to working with you with high-quality products, preferential prices and the best service. Look forward to this summit to show you the high-end strength and brand image of Ningbo West Magnetic Industry Development Co., Ltd.

Contact us:

Add: 99 Lipu road, Qianpu town, Zhenhai district, Ningbo city, Zhejiang province

Tel: + 86-574-86503108

Fax: + 86-574-86503109

E-mail:sales@1stmagnetech.com

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago
Professional manufacturer of iron removal equipment, Ningbo Ximeng Magnetic Industry Development Co., Ltd., with you about 2022, the Seventh China International New Energy Conference - Shanghai Metals Market (SMM)