MIIT Official Says Efforts Will Be Made to Optimise Development Environment of New Energy Vehicle Industry and Bring Key Raw Material Prices to Rational Level

Published: Mar 28, 2022 16:57
SHANGHAI, Mar 28 (SMM) – On March 26, Xin Guobin, Vice Minister of the Ministry of Industry and Information Technology (MIIT), said at the 2022 China Electric Vehicle 100 Forum that China's new energy vehicle industry has entered a new stage of large-scale and high-quality rapid development, and the fundamentals of the Chinese economy will remain sound in the long run, and the conditions for supporting high-quality development will not change.

SHANGHAI, Mar 28 (SMM) – On March 26, Xin Guobin, Vice Minister of the Ministry of Industry and Information Technology (MIIT), said at the 2022 China Electric Vehicle 100 Forum that China's new energy vehicle industry has entered a new stage of large-scale and high-quality rapid development, and the fundamentals of the Chinese economy will remain sound in the long run, and the conditions for supporting high-quality development will not change. The development of China's new energy vehicle industry will still be in a period of important strategic opportunities, but we must also be aware that some new situations and new problems need to be solved: In terms of supply quality, new energy vehicles still have some shortcomings in terms of quality and safety, low temperature adaptability, etc. The integration and development of electrification, intelligence, and networking needs to continue to deepen. In terms of supporting conditions, the supply capacity of key raw materials and parts required for large-scale development, and the guarantee capacity of charging and replacing services need to be improved. The current sharp rise in the price of raw materials for power batteries requires great attention and careful study and resolution.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
16 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 hours ago
MIIT Official Says Efforts Will Be Made to Optimise Development Environment of New Energy Vehicle Industry and Bring Key Raw Material Prices to Rational Level - Shanghai Metals Market (SMM)