Ningde era set up two new energy companies with a registered capital of more than 2 billion in a single day.

Published: Mar 25, 2022 15:23
[Ningde Times established two new energy companies with a registered capital of more than 2 billion in a single day] on March 24th, Ningde Times was successively exposed two pieces of news about the establishment of new energy business-related companies. First, Xiamen Times New Energy Technology Co., Ltd., it is reported that the company's registered capital is 2 billion yuan. The scope of business includes battery manufacturing, battery sales, electronic special materials manufacturing; electronic special materials sales; new materials technology promotion services and other businesses, the company is 100% owned by Ningde Times. Another new energy development company-Jining High-tech Zone Runyong New Energy Development Co., Ltd. was established.

SMM March 25: March 24, Ningde era has been exposed two pieces of news about the establishment of new energy business-related companies. First, Xiamen Times New Energy Technology Co., Ltd., it is reported that the company's registered capital is 2 billion yuan. The scope of business includes battery manufacturing, battery sales, electronic special materials manufacturing; electronic special materials sales; new materials technology promotion services and other businesses, the company is 100% owned by Ningde Times.

On the same day, another new energy development company, Jining High-tech Zone Runyong New Energy Development Co., Ltd., was established with a registered capital of 10 million yuan. The scope of business includes power generation business, transmission business, power supply (distribution) business; solar power generation technology services; emerging energy technology research and development.

It is reported that the company is 100% controlled by time Yongfu Technology Co., Ltd., and jointly owned by Ningde Times and Yongfu shares.

Previously, in the investor activity report in mid-February, Ningde Times revealed the company's layout and control of upstream lithium resources. Ningde Times said that the company ensures the supply of lithium resources through long-term cooperation, investment cooperation, recycling, self-exploitation and other ways. Among them, in terms of recovery, the recovery rate of lithium has exceeded 90%, and lithium recovery has now played a certain role in supply security; in addition to previous overseas investment and cooperation, Ningde era Yichun and other places have also invested in lithium resources and mined lithium mines on their own.

It is reported that the technological maturity of ternary battery recycling in Ningde era is higher than that of lithium iron phosphate battery recycling. Ningde era explained that the main reason for this is the high price of nickel and cobalt metals, and now, with the continuous increase in the price of lithium iron phosphate, the heat of lithium iron phosphate recovery is also increasing significantly. At present, Ningde era also has the annual recycling technology and production capacity of ternary and iron-lithium waste batteries, and the production capacity will continue to expand in the future. In addition to the positive electrode, the company has arranged graphite and electrolyte recycling to improve product economy and reduce product carbon emissions.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
19 hours ago
Ningde era set up two new energy companies with a registered capital of more than 2 billion in a single day. - Shanghai Metals Market (SMM)