SMM Evening Comments (Mar 18): Shanghai Nonferrous Metals Mostly Closed in the Positive Territory on Disturbed Supplies on Repeating COVID

Published: Mar 18, 2022 19:00 (GMT+8)
Shanghai nonferrous metals mostly closed with gains today with nickel being the only exception, but nickel still had strong support. While the market supply has been tightened due to repeating COVID that disturbed the logistics to some extent.

SHANGHAI, Mar 18 (SMM) – Shanghai nonferrous metals mostly closed with gains today with nickel being the only exception, but nickel still had strong support. While the market supply has been tightened due to repeating COVID that disturbed the logistics to some extent.

Shanghai copper rose 0.77%, aluminium added 3.26%, lead jumped 0.46%, zinc advanced 0.63%, tin advanced 3.69%, and nickel fell 0.82%.

Copper: The most-traded SHFE 2204 copper closed up 0.77% or 560 yuan/mt at 72,830 yuan/mt, with open interest down 3,279 lots to 99,282 lots.

On the macro front, Bank of England raise the benchmark interest rate by 25 basis points to pre-pandemic level, and warned that if energy prices remain high, inflation could reach double-digit level by the end of the year. Knot, European Central Bank Governor, also suggested the possibility of raising the rate twice this year. President Xi Jinping will have a conference call with Mr. Joe Biden concerning Sino-US relationship as well as other issues with key concern on March 18 as scheduled.

Aluminium: The most-traded SHFE 2205 aluminium closed up 3.26% or 720 yuan/mt to 22,830 yuan/mt, with open interest up 34,350 lots to 216,466 lots.

Aluminium prices rose on low inventory which has been falling. The recently resurging pandemic also disturbed the logistics in Shandong.

On the fundamentals, downstream demand was suppressed by high prices. On the supply side, new capacities are being put into production intensively.

Lead: The most-traded SHFE 2205 lead closed up 0.46% or 70 yuan/mt at 15,265 yuan/mt, with open interest up 2,405 lots to 57,815 lots.

Downstream companies mostly purchased on demand amid low lead prices in the past week, while secondary lead prices were even once higher than that of primary lead due to tight supplies, in which case downstream rigid demand flowed back to primary lead. In addition, repeating pandemic disturbed the logistics of lead ingot, tightening the supplies to some extent.

Zinc: The most-traded SHFE 2205 zinc closed up 0.63% or 160 yuan/mt at 25,545 yuan/mt, with open interest up 3,944 lots to 84,271 lots.

On the fundamentals, the consumption side was sluggish due to falling terminal orders, and the situation deteriorated amid disturbed transportation and work from home. In the spot market, social inventory across seven regions dropped 9,500 mt from a week ago due to delayed shipments on spreading COVID, and relatively sound transactions in the first half of the week.

Tin: The most-traded SHFE 2205 tin closed up 3.69% or 12,090 yuan/mt at 339,900 yuan/mt, with open interest up 3,115 lots to 32,613 lots.

In the spot market, most upstream companies quoted mostly with premiums of 8,000-10,000 yuan/mt over SHFE 2205 in morning trade, and held firm to the prices. But the premiums dropped to some extend amid falling SHFE tin prices in intraday trading. And upstream participants’ willingness to hold prices firm also weakened marginally after the prices reached desired level.

SHFE warrants inventory dropped 168 mt to 2,098 mt, down 550 mt or 20.77% in the past week. According to SMM research, refined tin social inventory dropped 1,630 mt to 3,201 mt, down 33.74% on a weekly basis. Both inventories recorded low after the Chinese New Year, underpinning tin prices.

Nickel: The most-traded SHFE 2204 nickel closed down 0.82% or 1,810 yuan/mt at 219,620 yuan/mt, with open interest down 3,816 lots to 53,010 lots.

On the fundamentals, NORNICKEL nickel, Sumitomo, NIKKELVERK nickel as well as nickel briquette could not declare customs due to great import losses, tightening the supply of pure nickel. For NPI, the prices gained strong support amid rising nickel ore prices.

On the demand side, downstream demand was suppressed by high pure nickel prices, and is waiting for the prices to return to normal. According to SMM research, both nickel sulphate and precursor plants were curtailing their production.

In terms of stainless steel, spot transactions and logistics were both affected by the spreading pandemic.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)