SMM Morning Comments (Mar 16): SHFE Base Metals Closed Mixed Overnight under COVID-19 Impact

Published: Mar 16, 2022 09:54
Source: SMM
Shanghai base metals closed mixed in the overnight trading on Tuesday as the demand weakened amid spreading COVID-19 pandemic. Their counterparts on LME mostly fell on Tuesday.

SHANGHAI, Mar 16 (SMM) – Shanghai base metals closed mixed in the overnight trading on Tuesday as the demand weakened amid spreading COVID-19 pandemic. Their counterparts on LME mostly fell on Tuesday.

LME copper rose 0.05%, aluminium fell 0.48%, lead lost 0.35%, and zinc dropped 0.38%.

SHFE copper inched up 0.03%, aluminium lost 0.12%, lead rose 0.27%, and zinc fell 1.01%.

Copper: LME copper opened at $9,854/mt yesterday, then fell to $9,820/mt. At last, the contract closed at $9,892/mt, up 0.05%. Trading volume was 15,000 lots, and open interest stood at 247,000 lots.

SHFE 2204 copper contract opened at 71,200 yuan/mt in overnight trading and then dropped to the intraday low of 71,150 yuan/mt before touching the high of 71,500 yuan/mt. At last, the contract closed at 71,460 yuan/mt, up 0.03%. Trading volume was 23,000 lots, and open interest stood at 109,000 lots.

On the macro front, supply concerns over crude eased amid subsiding geopolitical tensions and progress of US-Iraq negotiations. Meanwhile, resurging COVID pandemic across the globe heightened worries over the demand side, hence overnight WTI and Brent crude both dropped for the second consecutive day. The mitigating Russia-Ukraine conflict comforted the risk aversion sentiment toward US dollar, and US PPI inflation released yesterday showed weaker momentum than expected, redirecting the market attention to US Fed’s policy that is about to be released.

In the spot market, front-month and next-month spread fluctuated wildly, and the traders usually become more active when the spread is huge. However, spreading pandemic has suppressed market shipments, and the hindered logistics also affected downstream demand.

LME copper is expected to move between $9,840-9,940/mt today, SHFE copper between 71,200-71,800 yuan/mt, and spot premiums between 200-260 yuan/mt.

Aluminium: LME aluminium opened at $3,315/mt on Tuesday and closed at $3,299/mt, down $16/mt or 0.48%.

Overnight, the most-traded SHFE 2204 aluminium contract opened at 21,235 yuan/mt, with the highest and lowest prices at 21,710 yuan/mt and 21,235 yuan/mt before closing at 21,700 yuan/mt, down 25 yuan/mt or 0.12%.

Ukraine and Russia will continue negotiations on Wednesday. Ukraine said the negotiations will be difficult, but added that there is room for compromise. Putin accused Ukrainian leaders of not being serious about resolving the conflict. According to China’s National Bureau of Statistics, the added value of industrial enterprises above designated size increased by 7.5% year-on-year from January to February, and the growth rate was 3.2 percentage points higher than that in December 2021.

Lead: LME lead opened at $2,263/mt yesterday, hitting the highest point at $2,291/mt and the lowest point at $2,230.5/mt, before closing at $2,260/mt, down 0.35%.

The most traded SHFE 2204 lead contract opened at 14,975 yuan/mt last night, reaching the highest level at 15,225 yuan/mt, and closed at 15,060 yuan/mt, up 0.27%.

Zinc: Three-month LME zinc opened at $3,792/mt last night, hitting the highest and lowest points at $3,824/mt and $3,736/mt respectively, and closed at $3,794/mt, down $14.5/mt and 0.38%. The trading volume rose to 6,617 lots, and the open interest fell by 4,194 lots to 244,000 lots. The prices met resistance at the 5-day moving average and gained support at 20-day moving average. The LME zinc stocks increased by 3,900 mt or 2.78% to 144,425 mt. The downstream demand is weakening amid easing Russia-Ukraine tension and recurring COVID-19 pandemic. The LME zinc is expected to trade between $3,730-3,780/mt today.

The most traded SHFE 2205 zinc contract opened at 25,150 yuan/mt last night, hitting the lowest and highest points at 24,815 yuan/mt and 25,000 yuan/mt respectively. It closed at 24,965 yuan/mt, down 255 yuan/mt or 1.01%. The zinc concentrate supply remained tight, so the domestic TCs are likely to drop further. The recurring pandemic in China impeded the logistics and increased the costs of downstream enterprises. The zinc spot prices dropped, but the downstream enterprises were wait-and-see, and the transactions were modest. The investors are expected to reduce their positions in the near term, and the zinc prices will keep rangebound. SHFE zinc is expected to trade between 24,800-25,300 yuan/mt, and the discounts of domestic 0# Shuangyan zinc will stand at 0 yuan/mt over the SHFE 2204 zinc contract.

Nickel: On the supply side, sources of NORNICKEL nickel, nickel briquette and NIKKELVERK nickel were all scarce mainly due to the great SHFE-LME spread, according to SMM research. In terms of NPI, there have been expansion plans in light of better cost efficiency for the production of stainless steel and falling imports of Indonesia NPI. On the demand side, downstream participants including nickel sulphate plants curtailed their production due to operation losses amid high pure nickel prices. For stainless steel, some mills are considering expanding their capacities, creating more demand for nickel. Currently, SHFE nickel will move rangebound before LME nickel resumes market.

Tin: Overnight, SHFE tin rallied slightly, but still hovered below 330,000 yuan/mt. Capital flowed out of SHFE tin market. SHFE tin warrants dropped significantly, the supply of goods in the spot market was still tight. The operating rates of solder companies in March are expected to increase significantly from the previous month. Supply and demand will remain weak. The signs of demand turning better are not yet clear. There is a high probability that SHFE tin will hover at highs.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Kamoa-Kakula Begins Receiving 30 MW Baseload Power as Solar-Battery Facility Reaches Commercial Operation
7 hours ago
Kamoa-Kakula Begins Receiving 30 MW Baseload Power as Solar-Battery Facility Reaches Commercial Operation
Read More
Kamoa-Kakula Begins Receiving 30 MW Baseload Power as Solar-Battery Facility Reaches Commercial Operation
Kamoa-Kakula Begins Receiving 30 MW Baseload Power as Solar-Battery Facility Reaches Commercial Operation
CrossBoundary Energy’s solar photovoltaic and battery energy storage system serving the Kamoa-Kakula copper complex in the Democratic Republic of Congo reached commercial operation on August 12, 2026, and is now supplying 30 MW of continuous baseload power to Kamoa Copper. The milestone comes 16 months after Kamoa Copper signed a power purchase agreement with CrossBoundary Energy in April 2025, marking the transition of the project from commissioning into commercial operation.​ The facility comprises 233 MWp of solar photovoltaic capacity and a 123 MVA/526 MWh battery energy storage system, designed to provide at least 30 MW of firm power to the mining complex. The battery system allows electricity generated during daylight hours to be stored and dispatched when solar generation falls, enabling the project to provide continuous power rather than intermittent daytime supply. CrossBoundary Energy said the project is the first operational solar-plus-battery facility of its type and scale in Africa to provide baseload power.​ The new power supply forms part of Kamoa-Kakula’s broader efforts to strengthen electricity reliability at the operation. Kamoa Copper, which is jointly owned by Ivanhoe Mines, Zijin Mining Group and the DRC government, has been developing additional solar and battery capacity alongside upgrades to the DRC grid as it seeks to reduce exposure to power interruptions and reliance on diesel-generated electricity.​ The start of commercial operations represents a meaningful power-supply milestone for Kamoa-Kakula, where electricity reliability remains important to maintaining stable mining and processing operations. The new 30 MW firm renewable supplyshould provide an additional source of continuous power alongside existing grid and backup generation, while reducing reliance on diesel. The development is particularly relevant as Kamoa-Kakula continues to manage operational and infrastructure constraints, making improved power availability an important factor in supporting more stable copper production.
7 hours ago
[SMM Analysis] Copper Concentrate Tightness Spreads to Scrap Market—Why Are Copper Scrap Prices Staying High?
12 hours ago
[SMM Analysis] Copper Concentrate Tightness Spreads to Scrap Market—Why Are Copper Scrap Prices Staying High?
Read More
[SMM Analysis] Copper Concentrate Tightness Spreads to Scrap Market—Why Are Copper Scrap Prices Staying High?
[SMM Analysis] Copper Concentrate Tightness Spreads to Scrap Market—Why Are Copper Scrap Prices Staying High?
[SMM Analysis: opper Concentrate Tightness Spreads to Scrap Market—Why Are Copper Scrap Prices Staying High?] Tight copper concentrate supply and deeply negative TCs are pushing smelters and fabricators toward recycled feedstock. Low global inventories, slow scrap generation and shortages of compliant material in China are supporting high payabilities. SMM expects import demand to remain firm, although any release of accumulated tax-excluded scrap in China could pressure prices.
12 hours ago
Sinomine’s Kitumba Copper Project Enters Final Commissioning Push After Successful Primary Crusher Trial
14 hours ago
Sinomine’s Kitumba Copper Project Enters Final Commissioning Push After Successful Primary Crusher Trial
Read More
Sinomine’s Kitumba Copper Project Enters Final Commissioning Push After Successful Primary Crusher Trial
Sinomine’s Kitumba Copper Project Enters Final Commissioning Push After Successful Primary Crusher Trial
Sinomine Resource Group (002738.SZ) reported further construction progress at its integrated Kitumba copper mining, processing and metallurgical project in Zambia. As of August 2026, the project’s 38-km water pipeline had been fully commissioned, while the primary crushing plant successfully completed its first integrated trial run with ore. The core supporting infrastructure and front-end crushing system are now ready for commissioning, marking the project’s entry into the final stage of construction. Kitumba is designed to process 3.5 million tonnes of ore annually, with a metallurgical capacity of 35,000 tonnes of copper cathode per year. At steady state, the project is expected to produce an average of 33,000 tonnes of copper cathode and 55,000 tonnes of copper concentrate annually. It has a designed operating life of 15 years and is expected to produce a total of 570,200 tonnes of contained copper over that period.
14 hours ago