Battery start-up Our Next Energy raises $65 million to build a new plant in the United States

Published: Mar 2, 2022 17:16
[battery startup Our Next Energy will raise $65 million to build a new factory in the United States] according to foreign media reports, Our Next Energy, a developer of battery energy storage systems, said they planned to build a battery factory in the United States after raising $65 million in a new round of financing.

Our Next Energy, a developer of battery energy storage systems, said it plans to build a battery factory in the United States after raising $65 million in a new round of financing, according to foreign media reports.

Mujeeb Ijaz, CEO of Our Next Energy, which is headquartered in (Novi), Novi, Michigan, said that they are currently looking for sites to build the plant and have narrowed it down to four states, but he did not disclose the names of the four states.

Our Next Energy said the new plant would be used to produce its Aries battery packs for four of its customers. The new investment will also be used to speed up the research and development of its Gemini batteries, the company said in a statement. The company said it showed off the Gemini battery in December, which will have a range of more than 750miles (1207 kilometers). Ijaz said its next energy plan is to use Gemini batteries in cars in 2026, but it has not yet signed a production contract with any carmaker.

The company's current round of financing was led by BMW I Ventures, and Coatue Managemen, a private equity firm from New York, as a new investor. Last October, Our Next Energy completed the first round of financing in the company's history, worth $25 million, and some of the investors who participated in the first round of financing also participated in the company's new round of financing.

"the core principles of Our Next Energy are doubling battery life, reducing battery costs and building a local supply chain, which resonate strongly with BMW I Ventures," said Baris Guzel, a partner at BMW I Ventures.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago