A Closed Production Cycle from “Nickel & Cobalt” to “Recycling and Materials” Will be Established Between Ronbay and GEM

Published: Mar 1, 2022 16:31
On February 28, Ronbay Technology (688005) and GEM (002340) announced that the two parties signed a strategic cooperation agreement regarding power battery recycling, the nickel resources and smelting in Indonesia and the PCAM (precursor of cathode active materials) businesses.

SHANGHAI, Mar 1 (SMM) - On February 28, Ronbay Technology (688005) and GEM (002340) announced that the two parties signed a strategic cooperation agreement regarding power battery recycling, the nickel resources and smelting in Indonesia and the PCAM (precursor of cathode active materials) businesses, and will jointly build a closed production cycle of "nickel and cobalt resource mining - power battery recycling – ternary battery precursor manufacturing – ternary material manufacturing".
The cooperation is constituted of three parts:

1. Power battery recycling: Participation in Wuhan Power Battery Recycling Technology Co., Ltd (18% equity or shareholding), a subsidiary of GEM, and 26% of the products produced are offered to Ronbay at fair prices.

2. Nickel resources and smelting in Indonesia: Affiliated companies of GEM will offer 8% stake in PT.QMBNEWENERGYMATERIALS to Ronbay.

3. PCAM businesses: From 2022 to 2026, Ronbay expects to purchase no less than 300,000 mt of PCAM from GEM, while GEM will open up its OEM business to Ronbay, allowing party A to provide raw materials such as MHP, nickel matte, ternary products scrap, nickel metal and cobalt hydroxide for the production of nickel and cobalt salts or PCAM.

At the current stage, based on the pursuit of energy density, coupled with the impacts of steeply rising raw materials prices and quickly developing LFP market, the transition to high nickel ternary products is accelerating, and the proportion is increasing as well. By the end of 2021, among China's annual output of ternary materials, high nickel products accounted for 37% of the total, compared with 9% in 2018. This is accompanied by a rapid increase in demand for nickel resources. PCAM and material companies in the downstream shall not only expand their own production capacity, but also gradually deepen cooperation with upstream nickel resource companies to get well prepared for the transition to high nickel products.

Based on Ronbay's business layout, it has the largest ternary cathode material capacity in China, and the overall product structure is dominated by 8 series. Meanwhile, in terms of upstream business synergy, 38,000 mt and 6,000 mt of ternary precursor capacity have been formed in Yuyao, Zhejiang Province and Zhongzhou, South Korea respectively by the end of 2021. And the engaging in upstream smelting and mineral resources will become one of the core concerns for the future development of Ronbay's high nickel business.

The cooperation with GEM will, on the one hand, obtain addition nickel resources; and on the other hand, the cooperation in lithium recycling will further address the shortcomings of Ronbay in upstream resources and provide stronger resource support for the subsequent expansion of its own precursor and cathode material capacity.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
14 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
14 hours ago
A Closed Production Cycle from “Nickel & Cobalt” to “Recycling and Materials” Will be Established Between Ronbay and GEM - Shanghai Metals Market (SMM)