The output of 300-series Stainless Steel to Rise by over 6% in 2022 on the Continuous Commissioning of New Capacity

Published: Dec 30, 2021 14:05 (GMT+8)
Shandong Xinhai Industrial released its high-end stainless steel project capacity replacement plan. The construction project is Shandong Xinhai Industrial. The equipment includes a 60-mt electric furnace, a 60-mt AOD refining furnace, and an LF refining furnace, with 460,000 mt/year of production capacity. The exit project is Shandong Yanzhou Alloy. The time for dismantling is in accordance with the regulations on capacity replacement and the requirements of the provincial government. Estimated commissioning time is July 2022.

SHANGHAI, Dec 30 (SMM) - Shandong Xinhai Industrial released its high-end stainless steel project capacity replacement plan. The construction project is Shandong Xinhai Industrial. The equipment includes a 60-mt electric furnace, a 60-mt AOD refining furnace, and an LF refining furnace, with 460,000 mt/year of production capacity. The exit project is Shandong Yanzhou Alloy. The time for dismantling is in accordance with the regulations on capacity replacement and the requirements of the provincial government. Estimated commissioning time is July 2022.

The new projects of Jiangsu Zhongtuo and Delong Phase II are expected to be put into operation in Q1 of 2022. The new capacity of stainless steel totals 3.52 million mt in 2022. The capacity that can be put into operation stands at 2.22 millio mt in H1 of 2022. 

The output of stainless steel in 2021 totalled 32.2 million mt, up 8% YoY. Among them, the main increase comes from 300-series and 400-series stainless steel. The output of 300-series stainless steel crude steel increased by 10.2% year-on-year to 16.32 million mt, and the output of 400-series stainless steel rose by 16.5% year-on-year to 6.33 million mt. The output of 200-series stainless steel fell 0.8% YoY to 9.55 million mt. 

The total stainless steel output in 2022 is expected to stand at about 33.25 million mt, an increase of about 3.2%. The increase mainly comes from the 300-series stainless steel, which will increase by about 6% year-on-year.

The new production capacity is likely to record 6.46 million mt in 2023, among which projects with a higher probability of commissioning are the Jiangsu Delong Liyang project and Shandong Xinhai Industrial. After 2024, it is expected that there will still be a large number of new capacity under construction, but they are all in the planning stage with great uncertainty.


 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Sep 28, 2026 17:34 (GMT+8)
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Read More
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
[Waste Lead-Acid Battery Market Update] Recently, the Heyuan Municipal Ecology and Environment Bureau issued the "Notice on Regulating the Management of Waste Lead-Acid Batteries." According to the Ecological Environment Code of the People's Republic of China, enterprises and public institutions that engage in the collection and storage of waste without a permit may be fined 200,000-1 million yuan; those that engage in utilization and disposal operations without a permit may be fined 1-5 million yuan and ordered to suspend operations or shut down, with responsible persons fined 100,000-1 million yuan; if the act constitutes a crime, criminal liability shall be pursued in accordance with the law.
Sep 28, 2026 17:34 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Sep 28, 2026 17:33 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Read More
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
[Market Dynamics of Waste Lead-Acid Batteries from E-bikes] Recently, the Guangzhou Municipal Ecology and Environment Bureau issued a notice on the key points for environmental management of waste lead-acid batteries from e-bikes in Guangzhou. The document clarifies that waste lead-acid batteries are hazardous waste (HW31, 900-52), and scrap batteries generated from store recycling, trade-in, and repair must be transferred to licensed units. Units holding a hazardous waste collection permit (including 900-52) are exempt from electronic transfer manifests during the collection process under the centralized collection pilot program.
Sep 28, 2026 17:33 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Sep 26, 2026 01:38 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Read More
Peru sees 1 million t/y copper output boost within five to six years
Peru sees 1 million t/y copper output boost within five to six years
Peru's Energy and Mines Minister Guillermo Shinno said the country expects to add about 1 million tonnes of annual copper production within five to six years through new mining projects. The world's third-largest copper producer anticipates 2026 output of 2.5 to 2.7 million tonnes, roughly unchanged from 2023 as declining ore grades and recurring social conflicts weigh on supply. The newly elected government is seeking to reverse that stagnation by cutting red tape; in the two months since taking office, mining companies have stepped up engagement with the ministry. Shinno said officials have identified 27 permits that could be eliminated from roughly 100 mining-sector requirements, without lowering environmenta
Sep 26, 2026 01:38 (GMT+8)