SMM Morning Comments (Dec 8): Shanghai Base Metals Rose across the Board amid Bullish Market Sentiments

Published: Dec 08, 2021 10:03 (GMT+8)
Shanghai base metals basically trended upward on Wednesday morning amid positive macro sentiments. Meanwhile, their counterparts on LME trended mixed.

SHANGHAI, Dec 8 (SMM) – Shanghai base metals basically trended upward on Wednesday morning amid positive macro sentiments. Meanwhile, their counterparts on LME trended mixed.

LME metals closed mixed in the trading on Thursday. Copper fell 0.28%, lead lost 0.29%, aluminium rose 1.18%, and zinc gained 1.86%.

SHFE metals all closed with gains in the overnight trading. Copper rose 0.49%, aluminium increased 0.83%, lead gained 0.94%, zinc won 1.33%, and nickel rose by 2,000 yuan/mt.

Copper: Three-month LME copper opened at $9,635/mt in the overnight trading last night and rose rapidly to the highest point at $9,677.5/mt, then fell to the lowest level at $9,540/mt. It closed at $9,550.5/mt, a drop of 0.28%. The trading volume was 14,000 lots, and the open interest was 26,000 lots. Three-month LME copper is expected to trade between $9,500-9,600/mt today.

The SHFE 2201 copper contract opened at 70,160 yuan/mt last night and rose 0.49% to close at 69,860 yuan/mt after hitting the lowest level at 69,600 yuan/mt. The trading volume was 48,000 lots, and the open interest stood at 142,000 lots. SHFE copper is expected to trade between 69,300-69,900 yuan/mt today, with spot prices between premiums of -100-100 yuan/mt.

The market concerns of COVID-19 variant Omicron resided. The US stocks market a largest gain in the past 9 months. Meanwhile, the negotiations on nuclear weapons between US and Iran was interfered. The oil prices kept rising amid weakened market concerns, which boosted copper futures. In the spot market, some holders lowered the prices by hearing the inflow of imported copper, and the spot premiums dropped rapidly. However, the downstream users refused to purchase at high prices, and the transactions were sluggish. The domestic consumption may not grow significantly at the end of the year. The spot premiums may stand low in the short term amid sufficient supply and opened import window.

Aluminium: LME aluminium opened at $2,592/mt on Tuesday and closed at $2,624.5/mt, an increase of $30.5/mt or 1.18%.

Overnight, the most-traded SHFE 2201 aluminium contract opened at 18,815 yuan/mt, with the highest and lowest prices at 18,940 yuan/mt and 18,780 yuan/mt before closing at 18,910 yuan/mt, up 155 yuan/mt or 0.83%.

According to SMM statistics, China’s aluminium output fell by 3% year-on-year in November. On the demand side, the export volume of unwrought aluminium and aluminium semis increased by over 20% year-on-year in November. In the short term, SHFE aluminium is expected to continue to move within a narrow range.

Lead: Three-month LME lead opened at $2,210/mt on Tuesday night and fluctuated between $2,200-2,210/mt in the Asian Session. Then the LME lead rose to $2,225.5/mt in the European session as US Congress passed an agreement to raise the debt ceiling. It closed at $2,200/mt, down 0.29% last night.

The most-liquid SHFE 2201 lead contract opened at 15,000 yuan/mt last and gained 0.94% to settle at 15,040 yuan/mt last night, with open interest decreasing 529 lots to 42864 lots.

Zinc: Three-month LME zinc gained 1.86% to settle at $3,232/mt last night, with open interest increasing 149 lots to 264,000 lots. LME stocks across LME-listed warehouses fell by 550 mt or 0.36% to 152,100 mt. The macro data in Europe performed well, and the effectiveness of the Omicron vaccine boosted market sentiment, pushing up LME zinc. LME zinc is expected to move between $3,200-3,250/mt.

The most-traded SHFE 2201 zinc contract gained 305 yuan/mt or 1.33% to settle at 23,165 yuan/mt, with open interest decreasing by 1,407 lots to 70,451 lots. The market sentiment became warm after the news that China's central bank will cut the RRR by 0.5 percentage point has been digested. SHFE zinc trended higher as the supply in December is likely to be less than expected. The most-traded zinc contract is expected to move between 23,000-23,500 yuan/mt today and #0 domestic Shuangyan zinc may trade at premiums of 100-120 yuan/mt over the SHFE 2201 zinc contract.

Nickel: The most traded SHFE nickel contract rose by 2,000 yuan/mt to 148,400 yuan/mt, driven by the macro sentiments. However, the upward momentum at fundamentals remained weak. The spot consumption was thin, and the stainless steel prices kept falling. In the new energy industry, the precursor plants have reduced the production in November in order to reduce the stocks, and they had weaker demand of nickel, which may suppress the nickel prices. The prices may rise in the short term, but the investors should be cautious in the bullish operations.

Tin: According to SMM's survey, domestic refined tin output declined slightly from the previous month in November and is expected to stabilise in December. Overnight, the SHFE 2201 tin contract fell back after opening higher, and moved around 284,000 yuan/mt. Funds continued to flow out of the market due to wait-and-see sentiment among investors. The SHFE 2201 tin contract is expected to hover at highs.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)