CATL Gave Up Acquiring Canadian Company Millennial Lithium Corp

Published: Nov 18, 2021 15:23
The Canada-based Millennial Lithium Corp and Lithium Americas (LAC) jointly announced that they have entered into a definitive purchase agreement on November 17, 2021 for Lithium Americas to acquire all of Millennial's shares for a total consideration of approximately $400 million. Based on the closing price of LAC on November 16, 2021, Millennial shareholders will own approximately 9.1% equity of LAC.

SHANGHAI, Nov 18 (SMM) – The Canada-based Millennial Lithium Corp and Lithium Americas (LAC) jointly announced that they have entered into a definitive purchase agreement on November 17, 2021 for Lithium Americas to acquire all of Millennial's shares for a total consideration of approximately $400 million. Based on the closing price of LAC on November 16, 2021, Millennial shareholders will own approximately 9.1% equity of LAC.

Under the terms of the latest takeover offer between Lithium Americas and Millennial, the termination of Millennial's contract with CATL required Lithium Americas to reimburse CATL for of US$20 million. This compensation cost has now been repaid.

And from the fact that Millennial has received three large enterprises’ bidding up, it is not difficult to see that in this "mine-is-king" era, the acquiring of lithium ore resources is increasingly embattled. In addition, in September and October this year, the Australian lithium mine Pilbara auctioned its spodumene concentrate at a historically high twice, which also boosted the market sentiment. Lithium ore resources are comparatively scarce at present, and are highly priced as well.

Not only lithium mines, but also lithium from salt lakes, which are rich in lithium resources, are being snapped up by companies. Tibetan Everest recently announced a US$1.7 billion salt lake project in Argentina to build lithium carbonate production lines.

(previously on the story: Rumour Goes that CATL Will Bid for A Canadian Lithium Company at A Price of US$298 Million)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
9 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
9 hours ago
CATL Gave Up Acquiring Canadian Company Millennial Lithium Corp - Shanghai Metals Market (SMM)