Chevrolet Bolt Electric Car to Suspend Production for Another 3 Weeks

Published: Nov 8, 2021 16:38
GM said on November 5 that its Orion assembly plant that produce Chevrolet Bolt electric vehicles in Michigan will suspend operation for three weeks.

SHANGHAI, Nov 8 (SMM) – GM said on November 5 that its Orion assembly plant that produce Chevrolet Bolt electric vehicles in Michigan will suspend operation for three weeks. 

GM expanded the recalled Bolt EVs to more than 140,000 units in August. Several Bolt EVs caught fire due to battery defects. GM will replace the battery module of the vehicles to solve the risk of fire. The Orion assembly plant announced a shutdown after the recall in August. The plant will suspend production again from November 15 and the production is expected to resume on December 6.

Replacing battery modules for the recalled vehicles is still their current priority. The company stated that they will continue to adjust the plant's production plan for the sake of the recall. The company’s president Mark Reuss said last month that they will work to resolve the recall issue before resuming production of new cars.

GM has suspended Bolt sales, and Reuss stated that GM must verify these vehicles before dealers resume selling Bolt models. But they did not disclose when the dealers will restart sales of the model. GM disclosed in October that its battery partner, LG Electronics in South Korea, had agreed to compensate for estimated costs and expenses of $2 billion related to the recall. In addition, GM and LG Energy Solution are currently building two joint venture plants in the United States.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Cuba fuel squeeze to halt Sherritt’s nickel-cobalt operations
23 hours ago
Cuba fuel squeeze to halt Sherritt’s nickel-cobalt operations
Read More
Cuba fuel squeeze to halt Sherritt’s nickel-cobalt operations
Cuba fuel squeeze to halt Sherritt’s nickel-cobalt operations
Due to the ongoing tight fuel supply in Cuba, Sherritt International Corp. plans to suspend mining and processing operations at its nickel-cobalt joint venture in Moa. The company has already scaled back activities and expects to enter a temporary shutdown in the near term, using the downtime to carry out scheduled maintenance. The immediate cause of the suspension is the failure of planned fuel deliveries to materialize. Sherritt is engaging with relevant parties and evaluating alternative sources of key inputs. The project is operated in partnership with General Nickel Company SA, and its semi-processed materials are typically shipped to a refinery in Alberta, Canada, which has a combined capacity of about 38,200 tonnes.
23 hours ago
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
Feb 16, 2026 15:46
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
Read More
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
Italian electrochemistry and sustainable technology company Industrie De Nora S.p.A., through its subsidiary De Nora Permelec Ltd., has signed a binding Memorandum of Understanding with U.S. clean-energy materials company Tuleva Inc. to supply a high-capacity electrolysis system for Tuleva’s planned lithium hydroxide monohydrate refining project in the United States. Under the agreement, De Nora will deliver two ion-exchange membrane bipolar electrolysis systems (CECHLO 2C 843L), supporting an annual production capacity of approximately 11,000 tonnes of battery-grade lithium hydroxide monohydrate. The system contract is valued at over €10 million, and delivery is expected to be completed within 15 months after the final agreement is executed.
Feb 16, 2026 15:46
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
Feb 14, 2026 20:23
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
Read More
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
On February 5, the AC system of the Baota Mountain Converter Station, the sending - end station of the ±800 kV North Shaanxi - Anhui UHV DC power transmission project, was successfully energized for the first time. This marks that the AC system of the converter station has entered the startup commissioning stage, and the entire AC system of the project is expected to be put into operation before the Spring Festival. It is reported that the rated voltage of the North Shaanxi - Anhui UHV project is ±800 kV, with a rated capacity of 8 million kilowatts, and a dynamic investment of 20.5 billion yuan. The project starts from the Baota Mountain Converter Station in Yan'an City, Shaanxi Province, and ends at the Hezhou Converter Station in Hefei City, Anhui Province. It passes through three provi
Feb 14, 2026 20:23
Chevrolet Bolt Electric Car to Suspend Production for Another 3 Weeks - Shanghai Metals Market (SMM)