Rumour Goes that CATL Will Bid for A Canadian Lithium Company at A Price of US$298 Million

Published: Sep 16, 2021 10:53
Net rumours say that CATL (Contemporary Amperex Technology Co., Limited) (300750) intends to contribute C$377 million (US$298 million) to bid for the Canadian lithium company, Millennial, thereby ensuring a stable supply of lithium resources. The offer is said to be about 7% higher than Ganfeng Lithium's previous proposed offer.

SHANGHAI, Sep 16 (SMM) - Net rumours say that CATL (Contemporary Amperex Technology Co., Limited) (300750) intends to contribute C$377 million (US$298 million) to bid for the Canadian lithium company, Millennial, thereby ensuring a stable supply of lithium resources. The offer is said to be about 7% higher than Ganfeng Lithium's previous proposed offer.

Millennial, listed in Toronto, Canada, mainly engages in the acquisition, exploration and development of lithium mining. The Company's principal assets are the Pastos Grandes Lithium Salt Lake Project in Salta Province, Argentina, and the Cauchari East Lithium Salt Lake Project in Jujuy Province, Argentina.

In July this year, Ganfeng Lithium (002460) announced that, in order to expand the company's business coverage and enhance its core competitiveness, the company intended to offer to acquire as much as 100% of the equity of Millennial at a price of C$3.60 per share, in a transaction amounting to C$353 million the highest, while the real target was the salt lake projects in Argentina.

However, Millennial announced to the public on September 8 that it had received a non-binding unsolicited offer from a foreign lithium battery producer for C$3.85 per share, but did not mention the specifics about the company. An internal resource said that CATL was the buyer behind this proposal.

According to the media, Luoyang Molybdenum (603993) is also considering participating in the bid for Millennial.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago