New Lithium Battery Project with Output Value at 6 Billion Yuan/Mt Launched in Sichuan

Published: Sep 15, 2021 16:57
The signing ceremony of the cooperation agreement for Shenzhen Yanyi’s lithium battery core materials project with output at 150,000 mt/year was held on September 12 at the Management Committee of Pengshan Economic Development Zone in Sichuan.

SHANGHAI, Sep 15 (SMM) – The signing ceremony of the cooperation agreement for Shenzhen Yanyi’s lithium battery core materials project with output at 150,000 mt/year was held on September 12 at the Management Committee of Pengshan Economic Development Zone in Sichuan.

It is reported that this is Shenzhen Yanyi's second lithium battery industry project that is settled in Pengshan.

The investment in this project totalled about 2.5 billion yuan, and it covers an area of 66,667 square metre. It is planned to be officially put into operation in 2022, and the output value is expected to be about 6 billion yuan/year. It will have tax revenue about 500 million yuan per year and create job opportunities for about 100 people.

Shenzhen Yanyi is an innovation-driven technology company in the field of new energy and new materials. Its main business is based on the lithium battery functional materials and solid-state battery-related materials. It currently have five major business sectors: lithium battery binders, PI new materials, lithium supplement additives, lithium battery electrolyte and its additives, and solid-state batteries and its special special polymer special materials.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
6 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
6 hours ago
New Lithium Battery Project with Output Value at 6 Billion Yuan/Mt Launched in Sichuan - Shanghai Metals Market (SMM)