Increasing Battery Plants to Expand Production amid Booming NEVs Market

Published: Sep 08, 2021 12:12 (GMT+8)
China sold 1.007 million NEVs in H1, up 220.9% year on year, becoming the world's largest NEVs market. The best-seller list include Hongguang Mini, Li Auto, BYD Han, Changan Benben and Tesla Model 3. Sales of Wuling Hongguang Mini registered 30,142 units in July.

SHANGHAI, Sep 8 (SMM) – China sold 1.007 million NEVs in H1, up 220.9% year on year, becoming the world's largest NEVs market. The best-seller list include Hongguang Mini, Li Auto, BYD Han, Changan Benben and Tesla Model 3. Sales of Wuling Hongguang Mini registered 30,142 units in July.
The booming NEVs market benefits a lot from policy stimulus. The New Energy Vehicles Industry Development Plan (2021-2035) proposes that the average power consumption of new pure electric passenger vehicles will be reduced to 12 kWh/100 kilometers, the sales of new energy vehicles will reach about 20% of the total sales of new vehicles, and highly autonomous vehicles will achieve commercial in limited areas and specific scenarios. Pure EVs will become the mainstream of new sales vehicles by 2035, public vehicles will be fully electrified and fuel cell vehicles will be commercialised. Highly autonomous vehicles will be used on a large scale, effectively promoting energy conservation, emission reduction, and increasing social operating efficiency.  The rapid growth of NEVs will directly drive the installed capacity of motive power batteries. The installed capacity of motive power batteries is expected to maintain a rapid growth of 32% from 2021 to 2025 and will reach 390GWh by 2025.
More battery plants planned to expand production amid the booming NEVs market. Guoxuan Hi-Tech, Farasis Energy, Sunwoda Electronic, Jiangsu Azure Corporation announced lithium battery expansion plans in August.
Downstream battery plants have placed orders to upstream producers to ensure raw materials supply amid rising battery projects. BYD signed an agreement with YanAn Bicon Pharmaceutical, Guangdong Tonze Electric and Do-fluoride New Materials to ensure the supply of lithium hexafluorophosphate products. Zhejiang Hangke Technology received the bid-winning notice sent by BYD on September 3, with a total bid of 522 million yuan for lithium battery equipment.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Solis starts lithium drilling at Campo Grande
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Solis starts lithium drilling at Campo Grande
Read More
[SMM News] Solis starts lithium drilling at Campo Grande
[SMM News] Solis starts lithium drilling at Campo Grande
Solis Minerals has started diamond drilling at its Campo Grande Lithium Project in Brazil's Araçuaí-Salinas Lithium Valley. The company plans five holes totalling about 1,000 m, with planned depths of up to 200 m, to test lithium pegmatites across a 500 m corridor. The targets rest on coincident multi-element geochemical anomalies at surface and on historical auger drilling results. Historical work by Rio Tinto and later mapping and geochemical work by Solis defined the targets. Solis has also mapped a new pegmatite swarm of three coherent outcrop zones between planned holes DHCG-001 and DHCG-004. The program will test the continuity, geometry and lithium potential of the pegmatites beneath surface, starting where mapped pegmatites coincide with geochemical anomalies. Solis says Campo Grande's geology and geochemistry are comparable to PLS Group's Colina Lithium Project, about 100 km to the southwest. Separately, Solis has completed seven drill holes at its Mandacaru Lithium Project in Brazil, with assay results pending.
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Read More
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Charger Metals has mobilized a second drill rig to its Lake Johnston Lithium Project in Western Australia as part of a 10,000 m program targeting resource growth. Diamond and reverse circulation rigs are now operating at the Medcalf lithium deposit, and RC drilling began just over a week ago. The program will double the meters drilled at Medcalf. The drilling targets extensions and infill at the Medcalf inferred mineral resource estimate of 10.6 Mt grading 1% Li₂O. Drilling has further defined the Medcalf West Exploration Target of 3-5 Mt at 1-1.4% Li₂O. The program also aims to provide diamond core for metallurgical and geotechnical test work. Following the recent Medcalf resource upgrade, which raised contained Li₂O by 34%, Charger's board has committed to a Scoping Study on the Lake Johnston Project. The current resource sits on a predominantly 40 m x 80 m drilling grid, including 10,936 m of drilling at a cost of $32 per tone of contained Li₂O. The program is fully funded from Charger's sale of the Bynoe Lithium Project to Core Lithium for $3.75 million cash, received on 17 July 2026. Lake Johnston lies 450 km east of Perth in the Yilgarn Province, about 70 km from the Earl Grey Lithium Project, where Covalent Lithium began mining and commissioning in March 2024.
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Sep 25, 2026 15:14 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Read More
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
On September 23(rd), Savannah Resources raised US$30 million for its Barroso Lithium Project in Portugal, via 408 million shares at £0.055/share, including US$11.2 million from subscription agreements with major shareholders. Combined with US$15.5 million cash on hand, funds go toward long lead item fabrication, access road works, EPCM contracting, plant engineering, permitting, and land use rights. Barroso's July 2026 phase one DFS outlined a 14-year mine life at 183,000 t/y lithium oxide, 5.5% grade, based on US$1,788/t pricing yielding US$3.2 billion EBITDA, US$1.9 billion free cash flow, and US$913 million post-tax NPV. The deposit holds 39 million tones at 1.05% Li2O for 411,900 tones contained, Europe's largest hard-rock spodumene resource. The funding advances one of the few large-scale hard-rock lithium sources under development outside China linked African and South American supply chains, feeding EU critical raw material diversification targets.
Sep 25, 2026 15:14 (GMT+8)