BTR Partnered with Fuan Holding Group to Build Anode Precursor Project with Annual Capacity of 100,000 mt

Published: Sep 1, 2021 15:27
BTR New Energy Material intends to establish a joint venture Sichuan Ruifu New Material Technology with Fuan to build a production line with annual output of 100,000 mt of lithium battery anode precursor and finished products.

SHANGHAI, Sep 1 (SMM) – BTR New Energy Material intends to establish a joint venture Sichuan Ruifu New Material Technology with Fuan to build a production line with annual output of 100,000 mt of lithium battery anode precursor and finished products. The project is planned to be constructed in two phases. The first phase is to build a production line with an annual output of 50,000 mt of lithium battery anode precursor and finished products (covering the anode front-end processes such as crushing, granulation, and coating, and finished products processes like carbonisation, screening, demagnetisation and packaging. The construction period is 12 months, and the total investment for the first phase is estimated to be 900 million yuan.

The second phase of the project plans to add an annual production line of 50,000 mt of lithium battery anode precursor and finished products. The specific progress will be determined according to the market conditions after the commissioning of the first phase.

On the capacity of anode materials, BTR has been the world's largest anode supplier for many years, and its production capacity is expanding. The effective production capacity stood at 106,000 mt in 2020, and is expected to reach 160,000 and 260,000 mt in 2021 and 2022, respectively.

The company gained operating revenue of 4.207 billion yuan in H1, a year-on-year increase of 168.83%. The sales of anode materials were 61,856 mt and operating revenue was 2.393 billion yuan, up 131.46% and 98.54% year-on-year respectively.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
CALB Signs 380 MWh Energy Storage Project Deal with Japanese Developer, to Supply 'Zhijiu' ESS Batteries
45 mins ago
CALB Signs 380 MWh Energy Storage Project Deal with Japanese Developer, to Supply 'Zhijiu' ESS Batteries
Read More
CALB Signs 380 MWh Energy Storage Project Deal with Japanese Developer, to Supply 'Zhijiu' ESS Batteries
CALB Signs 380 MWh Energy Storage Project Deal with Japanese Developer, to Supply 'Zhijiu' ESS Batteries
Recently, CALB announced on its official account that it had completed the signing of an agreement with a Japanese energy storage developer for a project with a scale of 380 MWh. Under the agreement, CALB will deliver its “Zhijiu” series ESS batteries to the Japanese client. This batch of products will be equipped with the company’s independently developed core battery cells, as well as liquid-cooling heat dissipation technology and an intelligent BMS management system, to meet the project’s practical needs for energy storage and dispatch.
45 mins ago
[SMM Analysis] Hydrometallurgy Recycling Market This Week: LFP Black Mass Prices Remained Firm, Ternary Black Mass Prices Were Temporarily Stable, 2026.3.30-2026.4.20
45 mins ago
[SMM Analysis] Hydrometallurgy Recycling Market This Week: LFP Black Mass Prices Remained Firm, Ternary Black Mass Prices Were Temporarily Stable, 2026.3.30-2026.4.20
Read More
[SMM Analysis] Hydrometallurgy Recycling Market This Week: LFP Black Mass Prices Remained Firm, Ternary Black Mass Prices Were Temporarily Stable, 2026.3.30-2026.4.20
[SMM Analysis] Hydrometallurgy Recycling Market This Week: LFP Black Mass Prices Remained Firm, Ternary Black Mass Prices Were Temporarily Stable, 2026.3.30-2026.4.20
Raw material side, spot lithium carbonate prices began to rise this week, while cobalt sulphate and nickel sulphate prices remained temporarily stable.
45 mins ago
Construction Kicks Off for Shanxi Yiye's 150 MW Standalone ESS Project
46 mins ago
Construction Kicks Off for Shanxi Yiye's 150 MW Standalone ESS Project
Read More
Construction Kicks Off for Shanxi Yiye's 150 MW Standalone ESS Project
Construction Kicks Off for Shanxi Yiye's 150 MW Standalone ESS Project
Recently, the Shanxi Yiye 150 MW/205 MWh standalone ESS, undertaken by Zhongrun Huarui Construction Co., Ltd., officially commenced construction in Beiwang Town, Fushan County, Linfen City, Shanxi Province. The project adopts the advanced technical route of “flywheel energy storage + LFP battery,” with a total installed capacity of 150 MW, including 50 MW/5 MWh of flywheel ESS installations and 100 MW/200 MWh of lithium battery ESS installations.
46 mins ago