New Material Product Revenue Approximately 1.357 Billion Yuan at Do-Fluoride New Materials

Published: Aug 26, 2021 14:34
Main products at Do-Fluoride New Materials include fluoride salts used in aluminium, new materials and lithium batteries. The company's new material products gained operating income of approximately 1.357 billion yuan, up 134.21% year-on-year, and lithium battery products brought about that of 286 million yuan, up 165.24% on the year.

SHANGHAI, Aug 24 (SMM) – Main products at Do-Fluoride New Materials include fluoride salts used in aluminium, new materials and lithium batteries. The company's new material products gained operating income of approximately 1.357 billion yuan, up 134.21% year-on-year, and lithium battery products brought about that of 286 million yuan, up 165.24% on the year.

According to semi-annual report, the company will form 150,000 mt of production capacity in H2 2021, which boasts electronic-grade hydrofluoric acid capacity whose annual capacity records 50,000 mt, including 10,000 mt of semiconductor-grade hydrofluoric acid, with sales topped the list in China. It also has been included into the supply chain of South Korea’s top semiconductor companies.

The company enjoys 3.5Gwh of lithium battery capacity and has more than 10-year experience of ternary soft-pack technology. The company joined with Nanning authorities to establish lithium battery project. Relying on the company’s intellectual property rights and patented technology, it will establish a 20GWh lithium battery project to produce lithium batteries and related supporting products.

According to the July Monthly Motive Power Battery Data released by the China Automotive Motive Power Battery Industry Innovation Alliance, the top 15 domestic motive power battery companies in terms of installation capacity in January-July include: CATL, BYD, LG Chem, AVIC Lithium, Guoxuan Hi-Tech, EVE Energy, SVOLT, Farasis Energy, Tafel New Energy, Tianjin EV Energies, Lishen Battery, Great Power, Sunwoda Electronic, REPT and Do-Fluoride New Materials. The amount of motive power batteries installed by Do-Fluoride New Materials registered 0.42GWh, accounting for 0.7% of the total.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
9 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
9 hours ago