The equipment of Xi'an Yi Siwei project has been put in place and began to be sold at full capacity.

Published: Aug 5, 2021 08:11

On the morning of July 30, Xi'an High-tech Zone held a forum on "Enterprise through train service for thousands of miles" and "pro-business to help enterprises". Many enterprises from the industrial chain of high-end equipment, new materials and new energy, electronic information, hard technology, automobile and so on are invited to attend the meeting.

According to the Xi'an High-tech Zone Management Committee, at the meeting, the general manager of Xi'an Yi Si Wei Company said that Xi'an Yi Si Wei project equipment has been in place and began to sell at full production.

The general manager of Xi'an Yiswei Company said that the overall progress of the construction and development of the Yiswei project is very smooth, which is inseparable from the help and strong support of Shaanxi Province, Xi'an City and Xi'an High-tech Zone. In the near future, Xi'an Yiwei will become the number one silicon wafer company in China.

As for how to achieve high-quality development of the semiconductor industry in Xi'an High-tech Zone, he suggested that Xi'an High-tech Zone should strengthen support for power and other supporting aspects of manufacturing enterprises, and introduce more policies on the introduction of high-end talents and foreign talents. At the same time, we can increase and guide enterprises that are currently doing semiconductor-related business or interested in developing semiconductor-related business to open up the upstream and downstream industrial chain, and jointly strengthen the semiconductor industry of Xi'an High-tech Zone, so as to achieve higher-quality development.

Yixiwei material is one of the few semiconductor material enterprises in China that produce 12-inch silicon wafers with energy. Yi Si Wei material Xi'an first factory design capacity of 500000 pieces / month. The products are polished wafers and epitaxial wafers, which are mainly used in logic chip (Logic), flash memory chip (3D NAND & Nor Flash)), dynamic random memory chip (DRAM), image sensor (CIS), display driver chip (Display Driver IC) and so on.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Stainless Steel Social Inventory Saw a Slight Buildup, While High Supply Coupled with Cautious Downstream Demand Constrained Destocking
Apr 3, 2026 16:06
[SMM Analysis] Stainless Steel Social Inventory Saw a Slight Buildup, While High Supply Coupled with Cautious Downstream Demand Constrained Destocking
Read More
[SMM Analysis] Stainless Steel Social Inventory Saw a Slight Buildup, While High Supply Coupled with Cautious Downstream Demand Constrained Destocking
[SMM Analysis] Stainless Steel Social Inventory Saw a Slight Buildup, While High Supply Coupled with Cautious Downstream Demand Constrained Destocking
Apr 3, 2026 16:06
Xinghe Molybdenum Has Abundant Resources and Will Commence Construction in H2 2026
Apr 3, 2026 15:41
Xinghe Molybdenum Has Abundant Resources and Will Commence Construction in H2 2026
Read More
Xinghe Molybdenum Has Abundant Resources and Will Commence Construction in H2 2026
Xinghe Molybdenum Has Abundant Resources and Will Commence Construction in H2 2026
Yankuang Energy stated at its 2025 annual results briefing that, according to the feasibility study report prepared by Changsha Engineering & Research Institute Ltd. of Nonferrous Metallurgy, Xinghe Molybdenum (Caosiyao Molybdenum Mine) is located in Xinghe County, Ulanqab City, Inner Mongolia Autonomous Region, and has molybdenum ore resources of 1.04 billion mt, metal content of 1.089 million mt, an average grade of 0.105%, and associated metals including tungsten and zinc. The designed capacity is 16.5 million mt/year of raw ore, and annual molybdenum concentrate production will reach 30,800 mt/year upon reaching full production. In February 2026, it was issued the electronic certificate for a mining license with an annual mining scale of 16.5 million mt, and construction is expected to commence in H2 2026, with a construction period of 1.5-2 years.
Apr 3, 2026 15:41
Angang Steel's April ferromolybdenum tender price was 282,800/mt
Apr 3, 2026 15:24
Angang Steel's April ferromolybdenum tender price was 282,800/mt
Read More
Angang Steel's April ferromolybdenum tender price was 282,800/mt
Angang Steel's April ferromolybdenum tender price was 282,800/mt
[Molybdenum-Iron Steel Tender Information] SMM, April 3: Angang Steel's latest ferromolybdenum tender price was 282,800 yuan/mt (acceptance bill), with a quantity of 210 mt and a delivery date of April 30.
Apr 3, 2026 15:24