CALB denied being sued for IP infringement by CATL

Published: Jul 22, 2021 11:03
There was news on July 21 that Contemporary Amperex Technology (CATL) has formally sued China Lithium Battery Technology (CALB) for patent infringement of lithium battery. The source said that the alleged infringement covers all products of CATL.

SHANGHAI, Jul 22 (SMM) - There was news on July 21 that Contemporary Amperex Technology (CATL) has formally sued China Lithium Battery Technology (CALB) for patent infringement of lithium battery. The source said that the alleged infringement covers all products of CATL.

The news immediately caused an uproar in the industry.

CATL is the world's recognised power battery leader, whose installed power battery capacity has been ranked first in the world for many years, and was only slightly surpassed by LG in May 2021. CALB is also a well-known power battery manufacturer in China, whose installed ternary capacity also ranked among the top two in China, and the installed ternary pure electric capacity ranked the fourth in the world.

However, CALB issued a statement, saying that it had not received a complaint against the infringement incident reported by the media as of the evening of July 21.

CALB stated that the company always regards independent research and development and technological innovation as the foundation, and carries out a comprehensive R&D layout and investment planning for the future.

According to CALB, it has long adhered to the two principles of technical achievement protection and IP risk prevention and control. While carrying out a full range of intellectual property rights protection, the professional intellectual property team will conduct comprehensive investigation to ensure that the products provided to customers do not infringe the intellectual property rights of others.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
9 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
9 hours ago