SMM Morning Comments (Jul 16): Shanghai base metals rose across the board as jobless claims data helped

Published: Jul 16, 2021 10:00
Shanghai base metals all cruised higher on Friday morning after the head of the Federal Reserve told Congress he saw no need to rush the shift towards tighter post-pandemic monetary policy. Meanwhile, their counterparts on the LME mostly cruised lower.

SHANGHAI, Jul 16 (SMM) — Shanghai base metals all cruised higher on Friday morning after the head of the Federal Reserve told Congress he saw no need to rush the shift towards tighter post-pandemic monetary policy. Meanwhile, their counterparts on the LME mostly cruised lower.

Shanghai base metals all closed higher in overnight trading. Copper rose 0.76%, zinc increased 1.16%, aluminium added 0.65%, nickel jumped 0.64%, lead advanced 1.05% and tin went up 1.21%.

The LME complex ended mostly higher on Thursday. Zinc added 1.65%, copper rose 0.96%, tin increased 0.83%, lead went up 1.41% and nickel strengthened 0.83%, while aluminium fell 0.24%.

Copper: Three-month LME copper rose 0.96% to end at $9,424/mt on Thursday, and is likely to trade between $9,420-9,500/mt today.

The most-active SHFE 2108 copper contract went up 0.76% to close at 69,100 yuan/mt in overnight trading, and it is expected to move between 68,900-69,500 yuan/mt today, while spot premiums will be seen at 210-300 yuan/mt.

Overnight, US jobless claims at the beginning of the week reached a new low during the pandemic period. The decrease in the number of initial jobless claims was in line with the overall economic recovery trend of the US. In addition, Federal Reserve Chairman Powell's biased remarks played down the market's worries about inflation and boosted the bullish sentiment.

Aluminium: Three-month LME aluminium fell 0.24% to close at $2,511/mt on Thursday.

The most-liquid SHFE 2108 aluminium contract rose 0.65% to settle at 19,470 yuan/mt on Thursday night.

Global liquidity is abundant, and domestic economic development is stable and improving. On fundamentals, the current aluminium consumption shows signs of weakening, while the aluminium ingot inventories are still in the decreasing cycle. Recently, power curtailment policies have been reported again in Yunnan, Henan and other places, which has impacted both the supply and demand sides. At present, the impact on the supply side is more serious, and the specific impact degree still needs further follow-up. Domestic aluminium prices are expected to continue to rise in the near term under the stimulation of power curtailment and other events, and problems such as the progress of power curtailment, inventory inflection points and changes in sentiment of long and short positions still need continuous attention.

Zinc: Three-month LME zinc rose 1.65% to close at $2964/mt on Thursday. Zinc stocks at LME-listed warehouses fell 200 mt to 248,925 mt. Overnight, US jobless claims at the beginning of last week reached a new low during the pandemic period. The continuation of Federal Reserve Chairman Powell's doves played down inflation concerns and boosted bullish sentiment. The contract is likely to trade between $2,930-2,980/mt today.

The most-liquid SHFE 2108 zinc contract rose 1.16% to end at 22,190 yuan/mt in overnight trading. The overseas easing policy continued, the power curtailment in Yunnan caused disturbance fundamentally, leading to the worries about supply amid low social inventories. However, it is expected that the contract will keep fluctuating in the near term after reserving zinc ingots. The SHFE zinc contract is expected to move between 21,700-22,200 yuan/mt today, while spot premiums for domestic 0# Shuangyan will be seen higher at 210-230 yuan/mt.

Nickel: The most-active SHFE 2108 nickel contract rose 0.64% to close at 139,550 yuan/mt on Thursday. Nickel prices fluctuated at a high level, and expectations for stainless steel production reduction further fermented due to the short supply of ferrochromium, and the prices of contracts and spots continued to rise strongly. However, the reduction of stainless steel production is a negative factor for nickel, so the trend of nickel in the past two days is weaker than that of stainless steel. The consolidation of the contract in the range of 138,000-140,000 yuan/mt will continue to be monitored today.

Lead: Three-month LME lead settled 1.14% higher at $2329.5/mt on Thursday. LME lead stocks continued to decrease, and whether the contract could continue to hit a low rebound trend and stand firm above the five-day moving average will be monitored tonight.

The most-active SHFE 2108 lead contract went up 0.38% to close at 15,950 yuan/mt on Thursday night. The contract will test pressure from 16,000 yuan/mt today.

Tin: The most-liquid SHFE 2108 tin contract rose 1.21% to end at 224,200 yuan/mt on Thursday night. Support below will be seen from 222,000 yuan/mt today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
3 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
3 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
18 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
18 hours ago
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
18 hours ago
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
18 hours ago