SMM Evening Comments (May 31): Shanghai nonferrous metals rose across the board as China manufacturing activity grew in May

Published: May 31, 2021 18:00 (GMT+8)
SHFE nonferrous metals closed higher across the board on Monday May 31 as investors reacted to the release of China's official manufacturing Purchasing Managers' Index for May.

SHANGHAI, May 31 (SMM) – SHFE nonferrous metals closed higher across the board on Monday May 31 as investors reacted to the release of China's official manufacturing Purchasing Managers' Index for May.

Tin was the best performer with a rise of 1.75%. Copper rose 0.85%, aluminium advanced 0.51%, nickel climbed 1.73%, zinc increased 0.02% and lead went up 0.74%.

The ferrous complex also rose across the board. Iron ore increased 5.28%, rebar rose 2.45%, and hot-rolled coil climbed 1.27%.

Copper: The most-traded SHFE 2107 copper contract finished the day 0.85% higher at 73,950 yuan/mt. Open interest rose 1,191 lots to 210,172 lots.

Aluminium: The most-liquid SHFE 2107 aluminium contract finished the day 0.51% higher at 18,825 yuan/mt. Open interest fell 2,597 lots to 235,330 lots.

Zinc: The most-active SHFE 2107 zinc contract closed up 0.02% at 22,900 yuan/mt. Open interest fell 3,503 lots to 104,060 lots. SMM data showed that social inventories of refined zinc ingots across Shanghai, Tianjin, Guangdong, Jiangsu, Zhejiang, Shandong and Hebei decreased 1,100 mt from last Friday May 28 to 154,400 mt as of Monday May 31. The stocks were down 7,100 mt from May 24.

Nickel: The most-traded SHFE 2107 nickel contract ended the day 1.73% higher at 132,890 yuan/mt today. Open interest fell 1,624 lots to 124,181 lots.

Lead: The most-traded SHFE 2107 lead contract ended the day 0.74% higher at 15,625 yuan/mt. Open interest fell 984 lots to 56,843 lots. The overall trend was slightly stronger, while the consumption drive of lead ingots was still insufficient at the end of May, and the price difference between the contract and the spot further widened, prompting the enthusiasm of the cargo holders to hand over the warehouse again. In addition, as some commonly used delivery warehouses have reached the upper limit of the storage capacity, social inventories of lead ingots continued to increase, while the growth rate slowed down. The power curtailment in Yunnan had a certain impact on refined lead output. Whether the nonferrous metals could continue to generally increase to boost the contract to stand firm at 15,600 yuan/mt will be monitored tonight.

Tin: The most-liquid SHFE 2107 tin contract fell to a session low of 205,880 yuan/mt and finished the day 1.75% higher at 209,000 yuan/mt today. Open interest fell 1,176 lots to 37,996 lots. Due to the power curtailment and production suspension in Yunnan producing areas, the supply side further tightened to support the strong rise of tin prices. The shortage of domestic spot circulation will continue to support the trend of tin prices and the impact of macro-policy dynamics on the trend of futures prices will be monitored. Pressure above will be seen from 210,000 yuan/mt today. Support below will be seen from 197,000 yuan/mt today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
4 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
4 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
5 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
5 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
5 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
5 hours ago