China LiCoNi Summit 2021: Recycled nickel metal is expected to reach 62,000 gold mt in 2030

Published: May 21, 2021 16:00
In the case of the COVID-19 outbreak last year, the global sales of new energy vehicles can still grow against the trend.

CHANGSHA, May 20 (SMM) – In the case of the Covid-19 pandemic outbreak last year, global sales of new energy vehicles can still grow against the trend. "Based on the market forecast, the global sales of new energy passenger cars will continue to grow at a high rate of 25% in the next 10 years and reach the level of 30 million units in 2030," said Miranda Mei, senior analyst of lithium battery and materials at SMM.

From the perspective of sub-regional markets, China, Europe and the United States will become the three major driving markets, Mei told delegates at the 6th China International Lithium Cobalt Nickel Summit, which is organised by SMM in Changsha, Hunan province on May 20-21.

According to SMM recycling model, the battery recycling market will break out from 2025, with only 100GWh in 16-20 years and 380GWh in 21-25 years. In 26-30 years, the market will enter the TWh era, with a market scale of 1.2TWh, said Mei.

From the perspective of recycling battery types, lithium cobalt oxide batteries accounted for 24% in the past five years, and this ratio will drop to 3% during 2026-2030. At the same time, the proportion of iron lithium and ternary batteries will follow the power. The development of the automobile market has improved significantly, accounting for 97%.

In terms of metal quantity, the recovery of nickel, lithium and cobalt will also maintain a high growth rate in the future. SMM predict that in 2030, recycled nickel metal will reach 62,000 gold mt, with a compound growth rate of 37%, while recycled lithium will reach 40,000 gold mt, with a compound growth rate of 30%, and recycled cobalt will reach 24,000 gold mt, with a compound growth rate of 13%.

Mei pointed out that there are four major problems in the recycling market including macro-policy supervision to be strengthened, "responsible subject" not equal to "contributing subject", difficult standardized pricing, and white-listed enterprises with little profit.

In the short and medium term, recyclers will build recycling channels with car companies and battery companies to recycle raw materials for their own use and external sales. In the long run, third-party service providers will build C2B2B system.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
19 hours ago
China LiCoNi Summit 2021: Recycled nickel metal is expected to reach 62,000 gold mt in 2030 - Shanghai Metals Market (SMM)