SMM Evening Comments (May 14): Nonferrous metals on the SHFE fell across the board, lead plunged 2.24%

Published: May 14, 2021 18:44 (GMT+8)
SHFE nonferrous metals all closed lower on Friday May 14. Copper declined 1.92%, aluminium fell 2.03%, zinc shed 0.59%, nickel dropped 1.29%, lead slumped 2.24% and tin slid 0.13%.

SHANGHAI, May 14 (SMM) – SHFE nonferrous metals all closed lower on Friday May 14. Copper declined 1.92%, aluminium fell 2.03%, zinc shed 0.59%, nickel dropped 1.29%, lead slumped 2.24% and tin slid 0.13%.

Copper: The most-traded SHFE 2106 copper contract fell 1.92% to finish the day at 74,560 yuan/mt, with open interest decreasing 6,586 lots to 125,000 lots.

US first-time filings for jobless claims last week fell to a new low since the outbreak of the Covid-19 pandemic. Producer prices rose more than expected in April, adding to inflationary pressures. Mortgage interest rates fell for the second consecutive week, approaching their lowest level on record.

US retail sales for April and University of Michigan's consumer sentiment index for May are set for release tonight.

Aluminium: The most-active SHFE 2106 aluminium declined 2.03% to close the day at 19,315 yuan/mt, with open interest losing 18,174 lots to 179,000 lots. Domestic aluminium supply will increase as new capacities have been put into operation and as the import arbitrage window opened intermittently. Although the month of May is usually a high season for aluminium consumption, large fluctuations in prices may curb demand.

Zinc: The most-liquid SHFE 2106 zinc contract ended the day 0.59% lower at 22,020 yuan/mt, with open interest decreasing 3,129 lots to 69,120 lots.

Nickel: The most-traded SHFE 2106 nickel contract finished the day 1.29% weaker at 128,770 yuan/mt, with open interest losing 5,331 lots to 84,347 lots.

Lead: The most-active SHFE 2106 lead contract plunged 2.24% to close the day at 15,055 yuan/mt, with open interest losing 744 lots to 49,496 lots, posting a three-day losing streak.

Tin: The most-liquid SHFE 2107 tin contract slid 0.13% to end the day at 192,920 yuan/mt, with open interest declining 180 lots to 31,478 lots, and it is expected to move between 189,000-196,000 yuan/mt tonight.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
2 hours ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
2 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
2 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
2 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
3 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
3 hours ago