Steel News Roundup

Published: Apr 12, 2021 13:45 (GMT+8)
The third batch of the second round of inspection was implemented according to Environmental Protection Inspection Work Regulations approved by the Party Central Committee and the State Council.

SHANGHAI, Apr 12 (SMM) — This is a roundup of news in the steel industry for last week.

48 environmental violation cases reported in Tangshan during April 1-4

A total of 19.2 million yuan of fine was imposed on Tangshan Medium Thick Plate Co., Ltd., Tangshan Delong Iron and Steel Co., Ltd., Tangshan Yanshan Iron and Steel Co., Ltd., Hebei Rongxin Iron and Steel Co., Ltd., Tangshan Songting Iron and Steel Co., Ltd., Tangshan Fengnan Jingan Iron and Steel Co., Ltd., Tangshan Ganglu Iron and Steel Co., Ltd. , Tangshan Donghua Iron and Steel Co., Ltd., Tangshan Fengnan Kaiheng Iron and Steel Co., Ltd., Tangshan Chunxing Iron and Steel Co., Ltd., Tangshan Jinxi Iron and Steel Co., Ltd., Tangshan Jinma Iron and Steel Co., Ltd., and Tangshan Stainless Steel Iron and Steel Co., Ltd. Hebei Xinda Iron and Steel Group, Tangshan Jinma Steel Group, Tangshan Medium Thick Plate Co., Ltd., and Tangshan Songting Iron and Steel Co., Ltd. had their pollution discharge permits revoked and suspended operations due to online monitoring fraud.

The third batch of the second round of central ecological and environmental protection inspectors fully launched

The third batch of the second round of inspection was implemented according to Environmental Protection Inspection Work Regulations approved by the Party Central Committee and the State Council. Eight central ecological and environmental protection inspection teams will carry out inspections for about one month in 8 provinces (regions) including Shanxi, Liaoning, Anhui, Jiangxi, Henan, Hunan, Guangxi, and Yunnan.

Property market in many regions will cool down amid stricter regulations

Since April, many cities have continuously improved the property market regulation and control policies in school district housing, second-hand housing transactions, and the phenomenon of “selling out on opening day”. According to expert analysis, the intensive policies are filling the leaks of previous regulations, and demonstrate the firm position of the regulatory authorities to act in a timely manner to stabilise market expectations. It is conducive to preventing the local real estate market from overheating. The increase in housing price is expected to slow down.

Five listed banks exceeded personal mortgages

With the promulgation of new regulations on the concentration of real estate loans last year, the proportion of housing loans in the 2020 annual reports of listed banks became the market focus. According to the annual reports of 14 large state-owned banks and joint-stock banks, the proportion of real estate loans or personal mortgages have exceeded the standard at China Construction Bank, Postal Savings Bank, China Merchants Bank, China Citic Bank, Société Générale. Industry insiders pointed out that real estate market will be the focus of supervision in 2021. Banks that exceed the red line need to be rectified during the transition period, but the pressure is not great. However, the growth of bank-related housing loans that is approaching the red line will be under pressure.

Production restrictions in Tangshan reduced 1.74 million mt of pig iron output in March

According to the production of 26 steel plants involving 127 blast furnaces in Tangshan, SMM estimated that the actual pig iron output in Tangshan was 8.33 million mt in March under the environmental protection policies, a decrease by about 17% from 10.07 million mt in February. The demand for iron ore declined by 2.96 million mt, resulting in the poor sales of domestic iron ore concentrates in Tangshan, and some local traders sold them to the steel mills in Shandong and other southern regions.

The environmental protection inspections in Tangshan remain strict. If a company fails to meet environmental protection standards, its grade of environmental protection will be lowered, and the production will be further reduced. On the other hand, if a company's environmental protection is improved, it will be up-graded and increase production. In the end of March, the grade of Tangshan Zongheng Group’s Fengnan Steel was lowered from B- to D, and the grades of Tangshan Ruifeng Iron and Steel, Tianzhu Iron and Steel, and Donghai Special Steel were lowered from C to D.

SMM estimates that the environmental production restrictions in Tangshan will affect 26.61 million mt of pig iron output from April 1 to December 31 , equivalent to the demand of 45.24 million mt of iron ore.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Sep 28, 2026 17:34 (GMT+8)
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Read More
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
[Waste Lead-Acid Battery Market Update] Recently, the Heyuan Municipal Ecology and Environment Bureau issued the "Notice on Regulating the Management of Waste Lead-Acid Batteries." According to the Ecological Environment Code of the People's Republic of China, enterprises and public institutions that engage in the collection and storage of waste without a permit may be fined 200,000-1 million yuan; those that engage in utilization and disposal operations without a permit may be fined 1-5 million yuan and ordered to suspend operations or shut down, with responsible persons fined 100,000-1 million yuan; if the act constitutes a crime, criminal liability shall be pursued in accordance with the law.
Sep 28, 2026 17:34 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Sep 28, 2026 17:33 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Read More
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
[Market Dynamics of Waste Lead-Acid Batteries from E-bikes] Recently, the Guangzhou Municipal Ecology and Environment Bureau issued a notice on the key points for environmental management of waste lead-acid batteries from e-bikes in Guangzhou. The document clarifies that waste lead-acid batteries are hazardous waste (HW31, 900-52), and scrap batteries generated from store recycling, trade-in, and repair must be transferred to licensed units. Units holding a hazardous waste collection permit (including 900-52) are exempt from electronic transfer manifests during the collection process under the centralized collection pilot program.
Sep 28, 2026 17:33 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Sep 26, 2026 01:38 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Read More
Peru sees 1 million t/y copper output boost within five to six years
Peru sees 1 million t/y copper output boost within five to six years
Peru's Energy and Mines Minister Guillermo Shinno said the country expects to add about 1 million tonnes of annual copper production within five to six years through new mining projects. The world's third-largest copper producer anticipates 2026 output of 2.5 to 2.7 million tonnes, roughly unchanged from 2023 as declining ore grades and recurring social conflicts weigh on supply. The newly elected government is seeking to reverse that stagnation by cutting red tape; in the two months since taking office, mining companies have stepped up engagement with the ministry. Shinno said officials have identified 27 permits that could be eliminated from roughly 100 mining-sector requirements, without lowering environmenta
Sep 26, 2026 01:38 (GMT+8)